BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a bridge / tunnel in Zionsville, Indiana. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The Project includes the following Work: Removal and replacement of the existing wooden boardwalk pedestrian bridge approach structures adjacent to the pedestrian bridge over Eagle Creek in Turkey Foot Nature Park. New approaches are to be constructed as part of the Work. New bridge approaches will be pre-cast concrete boardwalk panels on helical piers. the construction of the following Project: Turkey Foot Trail Pedestrian Bridge Approach Replacement Bids for the construction of the Project will be received at the Town Hall located at 1100 W oak Street Zionsville, IN 46077 Addendums will only be sent to, and Bids will only be accepted by, prospective Bidders that appear on the Online List. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including addenda, if any, obtained from sources other than the Issuing Office. Bid Security Each bid shall be accompanied by an acceptable certified check made payable to the Town of Zionsville or an acceptable bid bond in the amount equal to 10% of the total bid price executed by an incorporated surety company in good standing and qualified to do business in the State of Indiana and whose name appears on the current Treasury Department Circular 570. Bonds A Performance Bond and Payment Bond each in the amount of 100% of the Contract price will be required from the Contractor to whom the work is awarded. Indiana Requirements The Standard Questionnaire Form 96 (latest version) must be fully completed, including attachment of Contractor's Financial Statement as stipulated in Section III, and signed. Instructions to Bidders. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.

Post-Bid

Bridges / Tunnels

$500,000.00

Public - City

Demolition, New Construction, Paving, Site Work

12

14

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
99
Active Projects
47
Bidding Soon
727
All Active Projects
280
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 13, 2024

December 13, 2024

img_map_placeholder

Turkey Foot Rd, Zionsville, IN

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.