BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 22, 2025 at 8:00 PM

Updated October 23, 2025

Site work, paving and outdoor lighting for a mixed-use development in Brothers, Oregon. Design plans call for site work for a sidewalk / parking lot; for outdoor lighting for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

As of October 22, 2025, per owner, this is in early pre design. Design and ROW acquisitions are expected to take 2 years. No general contractor has been selected. The bid advertisement and construction start dates are still to be determined. The Agreement will be for approximately 2 YEARS (April 2025 - April 2027) in duration with the option for the CITY OF BATTLE GROUND to extend it for additional time and money if necessary. The City of Battle Ground reserves the right to amend terms of this ""Request for Qualifications"" (RFQ) to circulate various addenda, or to withdraw the RFQ at any time, regardless of how much time and effort consultants have spent on their responses. Project Description The work to be performed by the CONSULTANT consists of developing a final design from WSDOT approved Intersection Control Evaluation (ICE) documentation of a multi-lane round-a-bout, improved street lighting, ADA Ramps, Rectangular rapid Flashing Beacons, and crosswalk improvements to improve safety and traffic flow. This project has received federal funding through an STBG Surface Transportation Block Grant. The City anticipates that the consultant's work will start as soon as contracts are awarded. If schedule allows, the City would like to put the design out to bid for construction in the first quarter of 2027. This project has an assigned DBE Agreement goal of thirteen percent (13%) mandatory for consultants on this project. The major features of the project are as follows: . Review ICE Documentation . Develop a complete design for a multi-lane roundabout, and associated improvements . Cost Estimate for Construction . Specifications for construction. (City will provide Division 1 Specifications) . Right-of-Way Planning and acquisition . Construction Support The CITY OF BATTLE GROUND reserves the right to retain the services of the successful firm(s) for any subsequent phases (R/W, CN) associated with this/these project(s). Evaluation Criteria Submittals will be evaluated and ranked based on the following criteria: 1. Qualification of Proposed Project Manager 2. Qualifications/Expertise of Firm 3. Ability to meet schedule 4. Approach to project 5. Experience working with the City of Battle Ground, and other relevant agencies. 6. Experience coordinating on a large project between WSDOT and the City of Battle Ground simultaneously. 7. Experience designing, acquiring ROW and Construction management of roundabouts on WSDOT Facilities working for the local agency. 8. Submittal Completeness Submittal Submittals should include the following information: Firm name, phone and fax numbers; Name of Principal-in-Charge and Project Manager; and Number of employees in each firm proposed to project. The qualifications must include but are not limited to: key personnel, firm experience, ability to meet schedule, past performance, in-house expertise, familiarity with WSDOT/FHWA standards, and DBE approach and commitment. Any requested cost proposals or elements of cost shall be in a concealed format and separate from technical/qualifications proposals. Any questions regarding this project should be directed to CHRIS MAYER, at 360-342-5051. Submittal of Request For Qualifications should also include: Statement of Interest . An overview of your firm . Resumes of proposed personnel to be used on the project . A proposed schedule with discussion of staff availability List of experience with the City of Battle Ground, and other relevant agencies . Information related to the selection criteria Contract The consultant contract will be a Local Agency A&E Professional Services Negotiated Hourly Rate Consultant Agreement. Equal Employment Opportunities The City of Battle Ground encourages disadvantaged, minority, and women-owned consultant firms to respond. Consultants will be held to federal EEO requirements for any project containing federal funds. The method of Contractor Selection has not been Determined at this time.

Design

Sidewalks / Parking Lot

$300,000.00

Public - City

Outdoor Lighting, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
14
Active Projects
5
Bidding Soon
94
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 3, 2027

Project location map

Multiple Locations, Brothers, OR

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.