BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Colton, California. Contact the soliciting agency for additional information.

San Bernardino County is seeking Proposals from interested and qualified Proposers to provide monitoring, preventative maintenance, and unexpected repairs to Arrowhead Regional Medical Center's underground storage tanks. The number of awards will be determined by the quality of the proposals received. PROJECT DESCRIPTION 1. Project goal and objectives - Provide monitoring, preventative maintenance and unexpected repairs to ARMC's underground storage tanks. 2. Deliverables/Requirements: a. Maintain five (5) 20,000-gallon Diesel storage tanks (Red Dye Diesel). b. Maintain four (4) 15,000-gallon Propane storage tanks. c. Maintain one (1) 1,000-gallon Hazardous Waste storage tanks. d. All-inclusive maintenance of all underground diesel, propane (LPG) and hazardous materials storage tanks (UST) systems includes: i. Monthly monitoring and compliance management. ii. Preventative maintenance of fuel and environmental monitoring systems. iii. Provide written monthly reports regarding UST systems. iv. Provide hazardous waste removal, when needed. v. Creation and implantation of in-house industrial hygiene, safety plans and for UST on behalf of ARMC. vi. Annual preparation and electronic submission of Cal EPA Hazardous materials plan for UST on behalf of ARMC. vii. Provide annual anode testing. viii. Respond within four (4) hours of emergency calls, including Veeder-Root alarms/emergencies. ix. Respond within 48 hours to inquiries and/or audits from regulatory agencies. x. Provide training to the Central Plant staff (all shifts). e. Required Testing: i. Annual - Monitor certification and Spill Bucket Testing: 1. Five (5) 20,000-gallon Diesel Tanks - Red Dye Diesel 2. One (1) 1,000-gallon Waste Tank ii. Annual - Cathodic Protection Testing: 1. Four (4) 15,000-gallon Propane (LPG) Tanks iii. Annual - Preparation and electronic submission of CAL Environmental Protection Agency (EPA) Hazardous Materials Plan. iv. Triennial - Secondary Containment Testing with OPI Drop Tube Testing: 1. Five (5) 20,000-gallon Diesel Tanks - Red Dye Diesel 2. One (1) 1,000-gallon Waste Tank f. Inspect the entire system to find possible early issues. g. Make unexpected repairs, not exceeding $60,000, to USTs and related equipment. h. Monitor equipment for unexpected problems and failures. i. Ensure that all of ARMC's USTs and monitoring equipment are kept in compliance and in proper working order. j. Contractor shall use a hazardous waste manifest and a transporter registered with the California Department of Toxic Substances Control (DTSC) to transport the waste to an appropriately permitted hazardous waste management facility operating under a DTSC permit. The transporter must have completed the California Highway Patrol's Basic Inspection of Terminals Program with a satisfactory rating. The Contractor shall submit to County documentation of proper disposal of the hazardous waste within 5 business days of transport. The contractor shall immediately inform County of any spill or discharge of hazardous waste or potentially hazardous waste verbally and in writing. k. The Contractor shall submit to the County monthly service reports of site visits, in areas, no later than 15 calendar days. Additionally, supervisors' quality inspections should be included in the monthly reports. l. The Contractor shall ensure spill prevention to prevent the impact to stormwater and surface water through Spill Prevention Containment and Countermeasures (SPCC) m. The Contractor shall submit to the County a Quality Control Plan (QCP) for approval 15 calendar days after award of the contract. The plan will cover all work performed by the Contractor and all subcontractors. This QCP shall include: i. A description of the Contractor's QCP ii. A chart showing the Quality Control (QC) organizational structure. iii. Names and qualifications, in resume format, of each person in the QC organization. iv. The duties responsibilities and authorities of each person in the QC organization. v. A listing of all subcontractors that will be employed by the Contractor, a description of the services their firms will provide and who will be responsible for providing QC service on their services. vi. Procedures to identify, record, track and complete rework items. vii. Documentation procedures including proposed report formats. The procedures must include provisions for recording the results of inspections and for recording corrective action taken. viii. Procedures used to record client complaints and follow up inspection process. ix. Procedures for identifying and documenting the final inspection process. x. Procedures that describe the process used to determine overall client satisfaction and the quality of services provided by the Contractor. n. The Contractor shall supply the County with an Emergency Notification Plan that includes emergency telephone numbers with an emergency on-site response time of four (4) hours or less. The Contractor shall provide emergency services including, but not limited to, monitoring and adjustment of the UST systems on a 24-hour-a-day, 7 day-a-week basis. Date for Tentative Contract Award :January 2024 Location where Services are to be provided, completed and managed is at 400 N. Pepper Ave., Colton, CA 92324. The Proposer must include in Proposal, Attachment E - Cost, all transportation, lodging, and per diem costs sufficient to pay its personnel and travel to the aforementioned locations Deadline for Submission of Questions November 8, 2024 @ 2:00PM (PST) All correspondence, and questions (not bid questions), must be submitted to the person identified below (RFP Contact): San Bernardino County Arrowhead Regional Medical Center (ARMC) Attn: Michael Williams 400 N. Pepper Ave. Colton, CA, 92324 (909) 580-4292- Phone ,(909) 580-0019- Fax ,Williamsm1@ARMC.SBCounty.gov- Email . Fax number and e-mail address may only be used to submit questions (not bid questions). Contract Term Services to be provided under this Request for Proposals (RFP) are outlined under Section V, Scope of Work. The Contract period will be for a maximum of five (5) years beginning on the date an agreement is signed by the Board of Supervisors or its designee. Questions regarding the contents of this RFP must be submitted in writing in ePro on or before the Deadline for Submission of Questions. All questions will be answered, and both the question and answer will be posted as an Addendum to the RFP in ePro.

Sub-Bidding

Water / Sewer

Public - County

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
207
Active Projects
94
Bidding Soon
2,198
All Active Projects
1,052
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 25, 2024

January 2, 2025

img_map_placeholder

400 N Pepper Ave, Colton, CA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.