BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

This is a service / maintenance or supply contract in Santa Ana, California. Contact the soliciting agency for additional information.

Gutter Downspout Cleaning and Repairs Contractor shall provide all labor, materials, tools and equipment required to perform gutter/downspout cleaning and inspection. Cleaning Scope Requirements: Clean all gutters and downspouts semi-annually in spring and fall. Contractor shall photograph before and after of areas cleaned. Contractor is responsible for any damage caused during the cleaning including damage caused by a ladder or lift. Blow or sweep roofs, valleys and walkway overhangs clear of debris as needed, prior to cleaning of gutters and downspouts. Clean gutters and downspouts by removing all mud, dirt, leaves, tree branches, trash, and any other debris by power washing until clear. If water is not available, contractor is to hand remove all debris. Do not rest ladders on sheet metal gutters. If needed, remove any leaf screens attached to the gutters and downspouts to remove debris and reinstall. Any debris left under the leaf screens is unacceptable. Clean splatter or water spots caused by pressure washing. (No water spots, film or dirt are to be left on the entrance glass doors and windows). All droppings, trash and debris dropped on the landscape, entryway, or sidewalk must be cleaned up. All waste is to be removed and transported to an offsite dumping facility. Inspection/Repair Scope Requirements: Inspect gutters and downspouts for rust, cracks, loose, broken, out of place hangers, corners or slopes, pulling of fasteners, broken joints or seams, excessive straining or punctures of gutter fabric. Provide an inspection report including photographs and proposal to the Project Manager of recommended repairs. Contractor must obtain Project Manager or designee's written approval prior to commencing any additional work and repairs. Contractor shall provide before and after photographs electronically to the Project Manager as confirmation the repairs are complete. Question Deadline 11/08/2024 at 2:00 PM PT

Post-Bid

Municipal

Public - County

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
233
Active Projects
111
Bidding Soon
2,391
All Active Projects
1,068
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 22, 2024

December 23, 2024

img_map_placeholder

Multiple Locations, Santa Ana, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.