Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a power facility in Hastings, Nebraska. Completed plans call for the renovation of a power facility.
the Condensing Unit and DX Coil Electrical Replacement at Whelan Energy Center, Unit 2, Public Power Generation Agency, Hastings, Nebraska. Each proposal shall be accompanied by a cashier's check, certified check on a solvent U.S. commercial bank, or a bid bond in an amount of not less than five percent (5%) of the total bid. Such check or bid bond shall be contained in a separate envelope attached to bidder's proposal. All proposal and bid bonds shall have original signatures. The successful bidder will be required to furnish a Performance Bond in the sum of the full amount of the Contract within ten (10) days of the date of award. No additional time will be allowed the Contractor for providing the Performance Bond. The PPGA reserves the right to accept the bid which best suits its needs whether the price is the lowest or not, to reject any or all bids, and to waive any informalities. No proposal may be altered, withdrawn or resubmitted within 60 days after the date set for the opening of proposals. PPGA is accepting bids for electrical work associated with a HVAC replacement project at Whelan Energy Center, 4520 East South Street in Hastings, Nebraska. The Bidder is highly encouraged to visit the site prior to submitting a bid. The Bidder shall inform their self of all conditions and factors which would affect the execution of the work. No claims for financial compensation or time extension, based on the lack of such prior information (or its effect on the cost of the work) will be permitted by the Owner. Please contact Derek Pfeifer, Production Engineer, at 402-462-3673 if you have any questions about this project or would like to set up a site visit. The work requiring the condensing units and duct heaters to be shut down will need to be completed during the spring 2025 outage. The remaining work can be done at any time before the outage. The plant will start the outage early morning on April 6 th , 2025. The HVAC units will need to be operational and ready to use by 7pm on May 7 th , 2025. Coordinate with mechanical contractor Perform all 480VAC work Remove and replace existing conduits, disconnects, junction boxes, and wires as specified Install 120VAC conduits, transformers, wire, contactors, wireways, and junction boxes for powering refrigerant detectors Install 24VDC control conduits, junction boxes, and wiring between detectors and DCS system and contactors. Install conduits as necessary for mechanical contractor's incidental control wiring as described in the HVAC specification Rewire panel 2SCC-TCPL-301 as shown in the drawings Submittals and other requirements as required by the electrical technical specifications If questions arise during the bidding process regarding the meaning of any portion of the contract documents, the prospective bidder shall submit the questions to the Architect for clarification. B. Any definitive interpretation or clarification of the contract documents will be published by addenda, properly issued to each person holding documents, prior to the bid date.
Sub-Bidding
Power Plant
$315,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 20, 2024
December 20, 2024
4520 E South St, Hastings, NE
Related To This Project
Hastings, NE
Bid Date: Nov 20 2024
Hastings, NE
Bid Date: Nov 20 2024
Hastings, NE
Bid Date: Nov 20 2024
Hastings, NE
--
Hastings, NE
--
Hastings, NE
--
Hastings, NE
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.