BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Brookline, Massachusetts. Contact the soliciting agency for additional information.

The Town of Brookline currently owns, operates, and maintains two prominently located parking lots on Centre Street near its intersection with Beacon Street, which have direct access to the Harvard Street commercial corridor through a series of pedestrian walkways as well as two driveways. Regional access to the Site is facilitated via the MBTA Green Line Coolidge Corner Station, approximately a one-minute walk southeastward from the Study Area. The Town is interested in evaluating whether and how the Site should be used into the future for parking, as well as for other public uses complementary to Coolidge Corner and the Brookline community at large This Request for Proposals carries a budget of $225,000. This study is funded by the American Rescue Plan Act and funds must be fully committed in December 2024 via an executed written contract, and fully exhausted by December 31, 2026, but preferably by September 2026. Proposals may be held open for a period of one hundred and twenty (120) days from the Proposal due date unless award is made sooner or the time for award is extended by consent of all parties concerned. The Town of Brookline reserves the right to reject all Proposals The Town of Brookline reserves the right to accept or reject any and/or all Proposals or elements of Proposals received pursuant to this Request, if it is in the Town's best interest to do so Final written questions from respondents due: November 6, 2024 at noon Final written response to questions from Town: November 8, 2024 Question Deadline 11/05/2024 at 10:00 AM ET RSVPs are required to receive a Zoom registration link; email Zachary Tesler, Economic Development and Long-Term Planner, at ztesler@brooklinema.gov to confirm virtual Q&A attendance by 4pm on Monday, November 4, 2024. The method of Contractor Selection has not been Determined at this time.

Conceptual

Sidewalks / Parking Lot

$225,000.00

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
369
Active Projects
215
Bidding Soon
2,753
All Active Projects
1,315
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 31, 2024

img_map_placeholder

Centre St, Brookline, MA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.