Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Paonia, Colorado. Contact the soliciting agency for additional information.
Reference Number 0000367068 Job Location: Rugged Mountain Terrain on the Side of Mount Lamborn, Paonia, CO. The Town of Paonia, Colorado (Town) is soliciting proposals from licensed contractors interested, experienced, and knowledgeable in providing brush clearing and site preparation on rugged mountain terrain on the side of Mount Lamborn. Brush clearing is needed prior to conducting geophysical survey work in support of the Town of Paonia Water System and must adhere to the limitations defined by National Forest Service permitting (by others). Site preparation generally includes traversing linear paths and trimming brush in five (5) locations under the following conditions: 1. Minor hand-cutting with the use of chainsaws. 2. Motorized heavy machinery will not be used. 3. No Spruces, Pines or Aspens will be cut. 4. No vegetation (trees) greater than a diameter at breast height (DBH) of four inches will be cut. Approximately 2-7 feet high vegetation must be cleared to ground level (i.e., ankle height) in paths 3 to 4 feet wide. Proposed linear pathways are roughly between 175 to 540 feet long. Work will be performed under supervision by Town staff and its representatives. All work areas are within the boundaries of source water collection for the Town of Paonia and/or on federal lands. All work must be completed without risk of pollution from hazardous liquids or solids. Wright Water Engineers will be onsite to sign off and approve of brush clearing activities to ensure work satisfies the intent and need of their subsequent geophysical study efforts. The attached figures depict the approximate length of pathways in each of the five (5) project locations. Project Schedule: Each location is expected to take 1-3 days depending on workforce allocation. The entirety of the work must be completed within 10 working days. Seasonal weather impacts may require completion of work in the Spring of 2025. If postponed until Spring 2025, work must be completed within a two-week period between March 1, 2025 and May 31, 2025 as soon as weather permits. Pricing Spring 2025 must be included in the contractor's proposal. Question Deadline 11/13/2024 at 4:00 PM MT Questions are submitted online Yes, Any questions or clarifications concerning this RFP shall be submitted by email to Stefen Wynn, Town Administrator, at e-mail address: StefenW@TownofPaonia.com; and 'cc'd to: SamiraV@TownofPaonia.com. Buyer Preferences, Guidelines & Requirements General Requirements - Certification/Training - Insurance Required - Prevailing Wage Required - Warranty Information Required The Town reserves the right to request additional information or clarifications from firms, and or to allow corrections of errors or omissions.
Conceptual
Sidewalks / Parking Lot
Public - City
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 20, 2025
Multiple Locations, Paonia, CO
Related To This Project
Paonia, CO
--
Paonia, CO
Bid Date: Jun 30 2023
Paonia, CO
Bid Date: Jun 12 2023
Paonia, CO
Bid Date: Jul 15 2022
Paonia, CO
Bid Date: Aug 16 2019
Denver, CO
Bid Date: Nov 26 2024
Pueblo, CO
Bid Date: Nov 14 2024
Loveland, CO
Bid Date: Nov 06 2024
Denver, CO
Bid Date: Nov 14 2024
Eagle, CO
Bid Date: Nov 21 2024
Lakewood, CO
--
Superior, CO
Bid Date: Nov 01 2024
Boulder, CO
Bid Date: May 23 2019
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.