BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 3, 2025 at 7:00 PM

Updated February 4, 2025

Renovation of a municipal facility in Columbia, South Carolina. Completed plans call for the renovation of a municipal facility.

*The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com. The Contractor shall provide all resources to remove two (2) VFDs, supply and install two (2) new VFDs with speed reference controllers brand names or equal to MODEL # ACS550-U2-316A-4. The new VFDs must fit within same space as current VFDs. State Fire prefers direct replacement of the old VFDs. If a direct replacement is no longer available, then a suitable replacement may be used if the replacement drives have at a minimum the same capabilities as the VFD being replaced but must fit into the same existing space as the removed VFDs. This system must remain in an operable state during all times (one (1) pump and its associated VFD should be on at all times). Desired pressure to be maintained should be between 125 - 140gpm. If there are any concerns with keeping one pump operable for any reason (safety concerns, etc.), this must be brought to the attention of the owner and a reasonable solution will be decided upon between the Contractor and owner before the project begins. The Contractor shall: 1. Remove input wiring, output wiring and control wiring from existing VFDs as necessary. 2. Install new VFDS and reattach existing wiring systems (high and low voltage) to VFDs (input, output, and control). 3. Alter any conduit and fittings to allow same circuitry to be attached to new VFDs. 4. Provide a factory start up and programing of the drive immediately after installation to verify proper operation. The system must produce between 125 - 140gpm. 5. Provide owner training after new VFDs are installed, started, and tested for proper operation. 6. Provide at least one-year parts and labor warranty. 7. Provide any salvageable components from the two removed VFDs to State Fire.

Award

Municipal

$87,960.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
190
Active Projects
72
Bidding Soon
1,228
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 17, 2025

February 12, 2025

Project location map

141 Monticello Trail, Columbia, SC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.