BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Waterloo, Iowa. Completed plans call for site work for a water / sewer project.

Rainbow Drive and Maynard Avenue at Greenhill Road, as described in detail in the Plans and Specifications prepared by City of Waterloo Engineering, now available for review and on file in the office of the General Manager of the Waterloo Water Works. The Contractor shall commence construction within ten (10) calendar days of the issuance of a Notice to Proceed by the Engineer. The Contractor shall be substantially complete with the Project with a fully functioning water main, all street repairs, finished grading and all other work except final seeding by May 31, 2025, and shall be entirely complete with all aspects of the project including all seeding and restoration by May 31, 2025. All proposals shall be made on official Proposal Forms furnished by the Board of Trustees of the Waterloo Water Works, Waterloo, Iowa, and must be enclosed in a separate sealed envelope and plainly identified as a bid for the aforesaid project and addressed to the Waterloo Water Works Board of Trustees, Waterloo, Iowa. Each proposal shall be accompanied in a separate envelope by either cash, a certified check drawn on a solvent state, or national bank; or a bid bond, in the form set out in the Specifications, executed by a corporation authorized to contract as a surety in the State of Iowa in the amount equal to five percent (5%) of the amount of the proposal, made payable to the of the Treasurer of the Waterloo Water Works Board of Trustees of Waterloo, Iowa. The bid deposit may be forfeited to the Board of Trustees as liquidated damages in the event the successful Bidder fails to enter into a contract and maintenance of said improvements as required by law within 10 days after the acceptance of the proposal. No Bidder may withdraw a proposal within 30 days after the date set for opening bids. If the work is not completed within the specified contract period, plus authorized extensions, the contractor shall pay to the Waterloo Water Works Liquidated Damages in the amount of five hundred dollars ($500.00) per day, for each day, as further described herein, in excess of the authorized time.

GC Bidding

Water / Sewer

$4,000,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
53
Bidding Soon
614
All Active Projects
333
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 10, 2024

January 9, 2025

img_map_placeholder

Multiple Locations, Waterloo, IA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.