BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a water / sewer project in Dover, Tennessee. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

The project includes the following Work: providing Replacement Windows and replacing all wood framing and window casing. Wood materials shall be wrapped with metal to prevent any moisture and rotting All window frames must be solid vinyl. Double-hung or single-hung type to have at a minimum the lower sash able to slide with a removable bug screen All glazing shall be double-paned with low E and Argon. c. The vapor seal on the glazing must have a minimum ten-year warranty All windows shall have a minimum one-year warranty on the operation of the window. e. All windows shall have a National Fenestration Rating, SHGC Rating, and UFactor meeting minimum energy code requirements as required by the International Energy Conservation Code, as currently adopted by the State of Tennessee. (This is a minimum U-factor of .30 for Dover.) f. Replacement Windows and replacing all wood framing and window casing all wood material shall be wrapped with metal to prevent any moisture and rotting. g. The contractor is responsible for measuring the replacement for the correct window opening. If any additional information is needed, please call the Town of Dover at 931-232-5907. Charles Parks Sr, City Administrator

Post-Bid

Water / Sewer

$200,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
23
Bidding Soon
647
All Active Projects
266
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 15, 2024

December 16, 2024

img_map_placeholder

To Be Determined, Dover, TN

Related To This Project


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.