BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving, outdoor lighting and renovation of a mixed-use development in Chandler, Arizona. Completed plans call for the renovation of a playground / park / athletic field; for site work for a playground / park / athletic field; for outdoor lighting for a playground / park / athletic field; for paving for a playground / park / athletic field; sidewalk / parking lot; sidewalk / parking lot; sidewalk / parking lot; and sidewalk / parking lot.

The CITY OF CHANDLER invites qualified consultants to submit Statements of Qualifications (SOQ's) to provide services for this project. All firms must be registered on the Arizona Procurement Portal vendor registration system prior to submitting an SOQ. Non-registered firms will not receive addenda notifications. Download solicitation documents and addenda at website. PRE-SUBMITTAL CONFERENCE: THERE WILL BE NO PRE-SUBMITTAL CONFERENCE SOLICITATION QUESTIONS DUE DATE: November 12, 2024 5:00 p.m. Arizona time All solicitation questions must be emailed to SOQ.Questions@chandleraz.gov with the subject line of "CA2402.401 Dr. A.J. Chandler Park Renovation Phase 1 RFQ". Questions received after the due date and time will NOT be considered. STATEMENT OF QUALIFICATIONS (SOQ) SUBMITTAL : Project Reference Forms (PRF) must be emailed, by the evaluator, to: project.reference@chandleraz.gov PRF's received after the due date and time will NOT be considered. INTERVIEW DATE: Week of January 7, 2025 A selection panel will evaluate and score each SOQ according to the criteria set forth in Section 5. Consultants invited to interview for this project must be available on the tentative dates as specified. Label Request for Proposals - City of Chandler Construction Manager at Risk (CM&Risk) Services for Dr. A.J. Chandler Park Renovation Phase 1, CA2402.401 Procurement Officer Email SOQ,Questions@chandleraz.gov Procurement Officer Phone 480-782-3308 Project Description: The project site contains approximately 2.3 acres of Dr. A.J. Chandler Park located at 3 S. Arizona Avenue, Chandler Arizona. The project scope of work consists of demolition of existing pavements, water features and structures, construction of new decorative hardscape plazas, relocated and new public art, extensive shade tree infrastructure including below-ground soil improvements, event lawns, seasonal plazas with social activities, seating and site furniture, park lighting, power, irrigation, and potential Wi-fi infrastructure. These improvements may include but are not limited to two large canopies flanking the Arizona Avenue crosswalk, storage rooms, one new restroom building, and three localized park shade canopies. Coordination with the Downtown Chandler Community Partnership, City of Chandler Special Events, City of Chandler Park Maintenance, and Salt River Project will be critical to the success of this project, as well as strategic construction phasing/staging to minimize impacts to the Downtown area. The estimated construction cost for this project ranges from $10 to $20 million. The CM@Risk Team is expected to provide construction work for the Project, adjacent improvements, or utility improvements, and is expected to stay within the City's estimated budget. Scope of Work: The City of Chandler is planning to use CM@Risk for pre-construction and construction services, and will require the CM@Risk to cooperate with the Project Designer throughout the pre-construction and construction phases of the Project. Both the Project Designer and the CM@Risk will be a part of the Design/Constructability Team working together to develop the design that best meets the City's needs and budget. During the Preconstruction Phase, the CM@Risk Team must collaborate with the City and Dig Studio on the design, constructability, cost and scheduling of the entire project, subsurface investigation as needed, attend coordination meetings with utilities, and provide Guaranteed Maximum Price ("GMP") pricing. Upon City's acceptance of terms, conditions and GMP, the Construction Phase will commence. During the construction phase, the CM@Risk Team must function as the General Contractor for the duration of the project.

GC Bidding

Playgrounds / Parks / Athletic Fields

$20,000,000.00

Public - City

Outdoor Lighting, Paving, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
48
Active Projects
23
Bidding Soon
735
All Active Projects
307
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.