Site work and new construction of an educational facility in La Mesa, California. Completed plans call for the construction of a 980-square-foot educational facility.

Question Deadline 11/08/2024 SUMMARY A. Project: Multi-Site Field Restrooms for Grossmont Union High School District 1. Grossmont High School - 1100 Murray Dr. El Cajon, CA 92020 2. Helix Charter High School - 4200 Lowell St. La Mesa, CA 91941 3. Monte Vista High School - 3230 Sweetwater Springs Blvd. Spring Valley, CA 91977 4. Santana High School - 9915 Magnolia Ave. Santee, CA 92071 5. Valhalla High School - 1725 Hillsdale Rd. El Cajon, CA 92019 B. Description of Work: Construction of one (1) or two (2) new single-story restroom buildings totaling approximately 250 square feet or 500 square feet of enclosed area, finish (precise) grading, drainage, and site utilities for an existing site, fencing, and miscellaneous sitework, as indicated in the Contract Documents prepared by obr ARCHITECTURE Inc. See drawings for restroom building quantity per site. PERFORMANCE REQUIREMENTS A. All work shall conform to 2022, Title 24, California Building Code (CBC). B. Changes to the approved Drawings and Specifications shall be made by addenda or a construction change document (CCD) approved by the Division of the State Architect, Office of Regulation Services, as required by Section 4-338, Part 1, Title 24, California Building Code. 1.03 WORK UNDER OTHER CONTRACTS A. No work is planned or scheduled to be performed by the Owner's own forces. 1.04 WORK SEQUENCE A. Work is to be conducted in a single phase based on a single lump-sum contract. All work shall be completed within time frame stipulated in the BID documents. The contract closeout procedure as specified in Section 01 77 00 - Closeout Procedures shall be completed within this period. Normal inclement weather for the various seasons of the year shall not be grounds for extensions of contract time, and the Contractor shall take this into account when formulating his Construction Schedule. By submitting a Bid and entering into this Contract, Contractor certifies that he has adequate resources and is fully capable of completing the Work within the allotted time.

Bid Results

Educational

$3,468,050.00

Public - City

New Construction, Site Work

254

35

183

3

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
28
Bidding Soon
807
All Active Projects
364
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.