BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 8, 2025 at 7:00 PM

Updated January 9, 2025

Site work and paving for a road / highway in Sacramento, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The work to be performed under this contract includes the furnishing of all labor, materials, equipment, and other incidental work for: The Project will install native plantings, irrigation, and a multi-use trail within an open space preserve creek corridor along a section of Gerber Creek. The Project will install native plantings over approximately 8.5 acres, an irrigation system, approximately 2,100 feet of paved bicycle path, and all other work specified on the plans and in the specifications. The Project creek section will be landscaped as a natural riparian corridor by planting native trees, shrubs, wetlands, and grasses within the creek bottom, along the channel banks, and surrounding uplands. The Project includes a minimum 5-year monitoring period that begins after plant installation. The Project includes, without limitation, furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more specifically described in the specifications. This Work will be performed in strict conformance with the plans, specifications, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to be performed and materials to be furnished are approximations only, being given as a basis for the comparison of Bids. Actual quantities of Work to be performed may vary at the discretion of the County. Class A - General Engineering Contractor AND Class C-27 - Landscaping Contractor There is no pre-bid meeting for this project. Each bid must be submitted on the bid forms provided in the Contract Documents; however, if none are provided, the surety may issue on its own paper. Each bid must also be accompanied by security in the form of a bid bond issued by a corporate surety, a certified check or cashier's check payable to the Treasurer of Sacramento County, or cash for an amount not less than ten percent (10%) of the aggregate sum of the bid. The successful bidder shall be required to execute a material and labor Payment Bond and Performance Bond, issued by a corporate surety, acceptable to the County of Sacramento, each for not less than one hundred percent (100%) of the contract price. Question Deadline 11/22/2024 at 5:00 PM PT Direct pre-bid questions to the Project Manager, Michael Meaney, via electronically. The Board reserves the right to reject any or all bids, to waive any informality in any bid, and to determine which bid, in their judgment, is the lowest responsive bid of a responsible Bidder.

Award

Roads / Highways

$1,865,875.00

Public - County

Paving, Site Work

27

14

14

4

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
454
Active Projects
198
Bidding Soon
2,606
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 12, 2024

February 12, 2025

Project location map

Gerber Ave, Sacramento, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.