Site work and outdoor lighting for a civil project in Maple Ridge, British Columbia. Completed plans call for site work for a road / highway; and for outdoor lighting for a road / highway.

The City of Maple Ridge ("City") invites Tenders for the upgrade of the Bosonworth Ave & 252 St Pressure Reducing Valve with SCADA. The work generally consists of: Installation of SCADA kiosk, related instrumentation and antenna pole. Supply and installation of a new necessary B.C. Hydro meter and electrical power service, grounding, field wiring of SCADA instrumentation and coordination of all work with that of B.C. Hydro. Supply and installation of communications conduit for future implementation of hardwired infrastructure. Connection of SCADA instrumentation to existing chamber components. City forces will be responsible for mechanical retro fitting of the chamber (i.e. flow meter and pressure transmitters). The contractor is not permitted to work on or tamper with any portion of the water system. If any water shutdowns are necessary, it must be coordinated through the Water Department. Road widening and installation of curb and gutter with catch basin relocation. Material testing including but not limited to subgrade, granular base, subbase and trench backfill densities for road widening, sieve analysis and proctor testing, concrete curb and gutter and parking/working pad densities, concrete testing, asphalt Marshall and core and density testing. Additional testing may be required as requested by the contract administrator. Installation of a retaining wall with steps, safety rail, vehicle access pad and asphalt working platform around the SCADA kiosk. Removal of dead trees and retaining existing trees as directed by the city arborist. Grading and topsoil/seeding of disturbed areas. Substantial Performance of the Work 56 working days from delivery of the kiosk after issuance of Notice to Proceed, with Substantial Completion anticipated by no later than July 30, 2025 Documents can be obtained from https://mapleridge.bidsandtenders.ca/ Question Deadline 11/18/2024 at 11:59 PM PT Duration in months: 6 Substantial Performance of the Work 56 working days from delivery of the kiosk after issuance of Notice to Proceed, with Substantial Completion anticipated by no later than July 30, 2025 Award is subject to final approval.

Award

Roads / Highways

$233,602.00

Public - City

Outdoor Lighting, Site Work

14

8

4

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
101
Active Projects
42
Bidding Soon
1,551
All Active Projects
627
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 27, 2024

January 6, 2025

img_map_placeholder

Bosonworth Ave & 252 St, Maple Ridge, BC

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.