Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 5, 2025 at 7:00 PM
Updated March 6, 2025
Site work and new construction of a mixed-use development in San Antonio, Texas. Completed plans call for the construction of a 25,000-square-foot educational facility.
*As of March 05, 2025, this project is under construction. Construction work strated in February 2025, and is expected to be completed in June 2026. Flintco, LLC is seeking proposals on the 100% CDs drawings and specifications provided by Pfluger Architects and RDG Planning & Design and their consultants for the remainder of the project for the Educare Building & Exterior Improvements in GMP #02. This is a brand new building to serve as an Early Childhood Education facility. There are 12 classrooms, a Gross Motor room, a secure vestibule, an admin suite, and outdoor play areas. The building reflects the TAMUSA features of arches and a connection to the outdoors. Alternates: Alternate #01 - Entry Canopy Alternate #02 - Free Standing Masonry Alternate #03 - North Gravel Drive Alternate #04 - Metal Wall Panels in lieu of Stucco Alternate #05 - Three Tier Brick Banding at Arched Windows Alternate #06 - East Playground Alternate #07 - Courtyard Playground Alternate #09 - Linear Metal Ceiling at Entry Plaza in lieu of ACT Alternate #10 - Gross Motor Room Resilient Athletic Flooring in lieu of Resilient Alternate #12 - Security Glazing or Security Glass per Sheet A01.07 Alternate #13 - Access Controls Alternate #14 - Design Master Fencing in lieu of Vinyl Coated Chainlink Fencing Requested Trades: Structural & Site Concrete; Masonry; Structural Steel Fabrication; Steel Erection; Misc. Metals; Waterproofing, Rigid Insulation & Sealants; TPO Membrane Roofing & Metal Flashing; Firestopping by Trades; Sliding Interior Storefront System at Gross Motor & Family Café; Aluminum Storefront, Glass & Glazing; Stucco; Drywall, In-Wall Rough Carpentry, Sheathing & Wall Assemblies; Acoustical Tile Ceilings; Tile; Resilient Sheet Flooring; LVT & Resilient Base; Carpet; Painting & Wallcovering; Specialties; Signage; Toilet Partitions & Accessories; Wall Protection; Fire Protection Specialties; Window Shades; Manufactured Casework; Solid Surface Countertops; Fire Suppression; Plumbing; HVAC (RTUs) & Building Automation System; Electrical; Structured Cabling; Access Control; Video Surveillance (Conduit & Cabling); Fire Alarm; Asphalt Paving; Ornamental Metal Fencing & Gates; Chain Link Fencing & Gates; Landscaping & Irrigation Construction (early site package) is expected to start in January 2025 with construction completion in April 2026. Please contact Christina Gonzalez (christina.gonzalez@flintco.com) for bid invitations via email or call (210) 973-2659.
Under Construction
Day Care Centers
$12,000,000.00
Public - State/Provincial
New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 12, 2024
February 3, 2025
To Be Determined, San Antonio, TX
Related To This Project
San Antonio, TX
--
San Antonio, TX
Bid Date: Dec 13 2024
San Antonio, TX
--
San Antonio, TX
Bid Date: Nov 19 2024
San Antonio, TX
Bid Date: Nov 18 2024
San Antonio, TX
Bid Date: Dec 05 2024
San Antonio, TX
--
San Antonio, TX
--
San Antonio, TX
--
San Antonio, TX
Bid Date: Nov 26 2024
San Antonio, TX
--
San Antonio, TX
--
San Antonio, TX
--
San Antonio, TX
--
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
