Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 5, 2025 at 7:00 PM

Updated March 6, 2025

Site work and new construction of a mixed-use development in San Antonio, Texas. Completed plans call for the construction of a 25,000-square-foot educational facility.

*As of March 05, 2025, this project is under construction. Construction work strated in February 2025, and is expected to be completed in June 2026. Flintco, LLC is seeking proposals on the 100% CDs drawings and specifications provided by Pfluger Architects and RDG Planning & Design and their consultants for the remainder of the project for the Educare Building & Exterior Improvements in GMP #02. This is a brand new building to serve as an Early Childhood Education facility. There are 12 classrooms, a Gross Motor room, a secure vestibule, an admin suite, and outdoor play areas. The building reflects the TAMUSA features of arches and a connection to the outdoors. Alternates: Alternate #01 - Entry Canopy Alternate #02 - Free Standing Masonry Alternate #03 - North Gravel Drive Alternate #04 - Metal Wall Panels in lieu of Stucco Alternate #05 - Three Tier Brick Banding at Arched Windows Alternate #06 - East Playground Alternate #07 - Courtyard Playground Alternate #09 - Linear Metal Ceiling at Entry Plaza in lieu of ACT Alternate #10 - Gross Motor Room Resilient Athletic Flooring in lieu of Resilient Alternate #12 - Security Glazing or Security Glass per Sheet A01.07 Alternate #13 - Access Controls Alternate #14 - Design Master Fencing in lieu of Vinyl Coated Chainlink Fencing Requested Trades: Structural & Site Concrete; Masonry; Structural Steel Fabrication; Steel Erection; Misc. Metals; Waterproofing, Rigid Insulation & Sealants; TPO Membrane Roofing & Metal Flashing; Firestopping by Trades; Sliding Interior Storefront System at Gross Motor & Family Café; Aluminum Storefront, Glass & Glazing; Stucco; Drywall, In-Wall Rough Carpentry, Sheathing & Wall Assemblies; Acoustical Tile Ceilings; Tile; Resilient Sheet Flooring; LVT & Resilient Base; Carpet; Painting & Wallcovering; Specialties; Signage; Toilet Partitions & Accessories; Wall Protection; Fire Protection Specialties; Window Shades; Manufactured Casework; Solid Surface Countertops; Fire Suppression; Plumbing; HVAC (RTUs) & Building Automation System; Electrical; Structured Cabling; Access Control; Video Surveillance (Conduit & Cabling); Fire Alarm; Asphalt Paving; Ornamental Metal Fencing & Gates; Chain Link Fencing & Gates; Landscaping & Irrigation Construction (early site package) is expected to start in January 2025 with construction completion in April 2026. Please contact Christina Gonzalez (christina.gonzalez@flintco.com) for bid invitations via email or call (210) 973-2659.

Under Construction

Day Care Centers

$12,000,000.00

Public - State/Provincial

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
255
Active Projects
90
Bidding Soon
2,353
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 12, 2024

February 3, 2025

Project location map

To Be Determined, San Antonio, TX

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed