BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

This is a service / maintenance or supply contract in Kent Township, Illinois. Contact the soliciting agency for additional information.

This project may contain Federal Funds. This project requires 26% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on January 30, 2025, at 10:00 AM at the Region Two/District Two Office in Dixon. Phase III engineering services are required for construction contract 64L27, US20/IL73 intersection reconstruction near Lena, including temporary runaround for staging, marked detour, guardrail, vertical re-alignment, temporary retaining walls, shoulder widening, resurfacing, culvert reconstruction, and tree removal. US20 from 0.4 mile west of IL73 to 1 mile east (Rees Rd), and IL73 from 0.4 mile north to 0.2 mile south of US20. The construction completion date is December 31, 2026. The Consultant must complete and submit final measurements, calculations, electronic as-built survey data, and final contract records documents to the department no later than five (5) months after construction completion. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The Prime firm must be prequalified in the Special Services (Construction Inspection) category to be considered for this project. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering and Agreement System (EPAS). The method of contractor selection has not been determined at this time. IDOT - 18 - RFP - Intersection Reconstruction at US 20 and IL 73 Near Lena, Phase III Project

Conceptual

Roads / Highways

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
80
Active Projects
49
Bidding Soon
731
All Active Projects
345
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2025

img_map_placeholder

US-20 & IL-73, Kent Township, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.