BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Peoria, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The proposed improvement consists of sidewalk, ADA ramps, curb and gutter and driveway pavement removal and replacement and all necessary adjustments, incidentals and appurtenances as shown in the plans in various locations throughout the City of Peoria. Description of Work. i. Proposed improvement is officially known as Sidewalks and ADA Ramps in 61605 ii. The proposed improvement consists of Construction of new PCC sidewalks and all associated work including PCC driveways, curb ramps, detectable warnings, and retaining walls, where required, in various locations throughout the City of Peoria. iii. Project locations are as follows: 19. The north side of Marquette between Laramie and Idaho 20. The south side of Garden between Laramie and Idaho 21. The intersection of Idaho and Garden 22. The north side of the intersection of Folkers and Antoinette and the southwest quadrant running south on Folkers 23. The north side of Marquette from Idaho to 1/3 block east of Folkers and the south side of Marquette from Folkers to 1/2 block east of Folkers 24. The intersection of Folkers and Garden running both east and west about 1/2 block 25. The intersection of Oregon and Antoinette (alternate location) 26. The north side of the intersection of Ligonier and Antoinette and the west side of Ligonier 27. The intersection of Ligonier and Marquette and the west side of Ligonier 28. The intersection of Ligonier and Garden and the west side of Ligonier 29. The south side of Wiswall from Griswold to Westmoreland 30. The intersection of Ann and Griswold 31. The intersection of Proctor and Griswold 32. The intersection of Antoinette and Griswold All proposals must be accompanied by cash, certified check, cashier's check, or a bid bond for not less than five percent (5%) of the amount of the bid. The successful bidder will be required to furnish a satisfactory Performance Bond for the full amount of the contract, with sureties, to be approved by the City Stormwater Engineer. Compliance with the Illinois Prevailing Wage Act is required under this contract. This project is funded through a Community Project Funding (CPF) Grant. The City of Peoria reserves the right to waive technicalities and to reject any or all proposals. Doc Notes: Electronic documents are available by providing contact information (company name, contact name, phone number, fax number and e-mail address) in an e-mail request to pwdropbox@peoriagov.org.

GC Bidding

Roads / Highways

$1,904,000.00

Public - City

Paving, Site Work

63

5

3

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
34
Bidding Soon
596
All Active Projects
292
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.