EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 29, 2025 at 7:00 PM

Updated October 1, 2024

Site work and outdoor lighting for a civil project in Oak Brook, Illinois. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; and water / sewer project.

The work for which bids are to be received generally and briefly consists of providing all materials, equipment and services necessary for the construction, installation, and testing of a conventional duplex lift station with submersible type wastewater pumps installed in an existing wet well with new top slab, ductile iron discharge piping, fittings, check valves and plug valves installed in a precast concrete valve vault, connection to existing force-main, pump control panel and SCADA system, associated electrical distribution panels, portable generator plug and manual transfer switch, site light, electric. service installation, bypass pumping, demolition of existing lift station, and site/landscaping restoration. The bid deposit for a proposal shall be made for an amount not less than 10% of the bid amount, in the form of a certified check, a cashier's check, or a bid bond, made payable to the Flagg Creek Water Reclamation District. In addition to the signed and completed proposal and the bid deposit, Bidders must also submit a signed and completed Affidavit on the form included in the Contract documents. Failure to submit these materials may cause the bid to be rejected. The successful Bidder to whom the Contract will be awarded shall sign the Contract, furnish a Performance and Payment Bond in an amount equal to 100% of the TOTAL BID AMOUNT as indicated in the Proposal, and certificates of insurance along with any insurance policies required by the Contract Documents within ten (10) days from the date of the Notice of Award. The amount of the check or bond shall be forfeited to the District if the Bidder neglects or refuses to enter into a Contract or fails to furnish the appropriate Performance and Payment Bond and insurance after his bid has been accepted. Bids received from contractors who are not on the Bidder's Plan Holder List will be rejected. The District reserves the right to reject any or all bids that are submitted, or to advertise for new bids. The District reserves the right to defer the acceptance of any bid and the execution of a Contract for a period not to exceed ninety (90) days after the date of opening the bids.

Award

Water / Sewer

$565,606.00

Public - City

Outdoor Lighting, Site Work

18

26

12

5

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Brick Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roofing and Siding Panels
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Musical Equipment, Bells
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Control-Voltage Electrical Power Cables, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Instrumentation and Control for Electrical Systems, Electrical Power Monitoring and Control, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Enclosed Switches and Circuit Breakers, Facility Electrical Power Generating and Storing Equipment, Lighting, Interior Lighting, Interior Lighting Fixtures, Lamps, And Ballasts
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Flexible Paving, Porous Flexible Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses, Plugging, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Electrical Utilities, Utility Substations, Communications Utilities, Communications Distribution
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
285
Active Projects
181
Bidding Soon
2,194
All Active Projects
1,104
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 5, 2024

January 6, 2025

img_map_placeholder

810 Coventry Ln, Oak Brook, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Reconstruction of Steeplechase Lift Station

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.