Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Morrison, Illinois. Contact the soliciting agency for additional information.
This project requires 24% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0.07. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on January 29, 2025, at 10:30 AM at the Region Two/District Two Office in Dixon. Phase I engineering services are required for the preparation of a Combined Design report and an Environmental Impact Statement (EIS), for the improvements of US 30 from 0.1 mi W of IL 78 (N) to 0.2 mi E of Jackson St. in Morrison. The proposed improvements include the reconstruction of US 30 including all side street intersections (Milnes Dr. is omitted) with horizontal alignment and vertical profile changes, curb and gutter, storm sewer, ADA ramps, a multi-use path, and retaining walls. This project will also include several public meetings, traffic management analysis, crash analysis, geotechnical and geophysical services, environmental coordination, Environmental Justice coordination, and cost estimates. A portion of this project area is historic, in nature and some buildings sit adjacent to the roadway. Consideration will be given to determine the structural stability of these buildings as we develop the project. The department will provide a preliminary geometric layout to be used as a basis for the project development. Agency coordination, including coordination with the City of Morrison and the Morrison IL Historical Society will be required to reduce any potential conflicts. The completion date for this contract will be 18 months after authorization to proceed. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The Prime firm must be prequalified in the Location Design Studies (Reconstruction/Major Rehabilitation) category to be considered for this project. The Environmental Reports (Environmental Impact Statement) prequalification category requirement may be completed by the Sub and/or Prime Consultant. The environmental work must be performed using staff that has been presented in your most recently approved Statement of Experience and Financial Condition. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. IDOT - 22 - RFQ - US 30 From 0.1 MI. W. of IL 78 (N) to 0.2 MI. E. of Jackson Street in Morrison, Phase I Engineering Services and EIS
Conceptual
Roads / Highways
Public - State/Provincial
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 21, 2025
US-30, Morrison, IL
Related To This Project
Morrison, IL
Bid Date: Dec 11 2024
Morrison, IL
Bid Date: Dec 02 2024
Morrison, IL
Bid Date: Sep 12 2024
Morrison, IL
--
Morrison, IL
Bid Date: Aug 26 2024
Morrison, IL
Bid Date: Apr 26 2024
Morrison, IL
Bid Date: Jan 30 2024
Morrison, IL
Bid Date: Jan 10 2024
Morrison, IL
Bid Date: Dec 11 2023
Morrison, IL
Bid Date: Sep 29 2023
Morrison, IL
Bid Date: Jun 17 2022
Morrison, IL
Bid Date: Jan 13 2022
Morrison, IL
Bid Date: Feb 25 2022
Morrison, IL
Bid Date: Jan 28 2022
Morrison, IL
Bid Date: Apr 15 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.