BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 3, 2024 at 7:00 PM

Updated December 4, 2024

Site work and paving for a mixed-use development in Bakersfield, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; road / highway; and water / sewer project.

constructing curb and gutter, driveway, drive approaches, sidewalk, cross drains, walkways, and curb ramps, paving hot mix asphalt, installing survey monument encasements, fences, gates, under sidewalk drains, drainage inlets, discharge structures, reinforced concrete pipes, and rock slope protection, grading drainage sump, reconstructing fences, gates, and block walls, relocating mailboxes and roadside signs, resetting gates, removing bollards, fences, gates, and thermoplastic pavement markings, and painting thermoplastic pavement markings and thermoplastic traffic stripes. Liquidated Damages $2,000/day Estimated Bid Value $7,664,652 Project Duration 95 working days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Online Q&A Yes Q&A Deadline 11/14/2024 4:00 PM (PDT) This contract has a delay start. Contractor's working days shall begin on September 2, 2025. Contractor shall begin work within 15 calendar days after the date working days begin and shall diligently prosecute the same to completion by the time set forth in contract documents.

Award

Sidewalks / Parking Lot

$6,792,792.00

Public - County

Paving, Site Work

97

8

22

8

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
113
Active Projects
51
Bidding Soon
738
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 20, 2024

September 2, 2025

Project location map

Multiple Locations, Bakersfield, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.