BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Omaha, Nebraska. Completed plans call for the renovation of a educational facility.

As of November 25, 2024, this project has not yet been awarded. The project is expected to be awarded on December 3, 2024. The entire project is within MPS Andersen Middle School, 15404 Adams Street, Omaha NE 68137. The project consists of: Demolition of existing kitchen hood, exhaust fan, and make-up air unit and replacement with new equipment. Miscellaneous ductwork modifications. Any questions concerning clarification of this bid should be directed to: Josh Roth Morrissey Engineering 4940 North 118th Street Omaha, Nebraska 68164 Phone: (402) 491-4144 jroth@morrisseyengineering.com Work under this contract includes all material, labor, tools, expendable equipment, utility and transportation services, and all incidental items necessary to perform and complete, in a workmanlike manner, the work required for the construction of the MPS Andersen Middle School Kitchen Hood Replacement. C. Renovations will take place during staff and student summer vacation, but various areas of the facility will be occupied by summer school activities. Contractors and MPS staff will work closely to isolate areas of work. D. Work in the facility shall be allowed during normal working hours throughout the project, however, the contractor must provide, at all times, for clear exit paths, proper lighting, and fire/smoke protection (subject to approval of all authorities having jurisdiction) and protection against any and all fumes and odors caused by construction activities. The contractor shall halt or modify any activities the Owner determines to be disruptive in any manner to their continued use of the building. E. In addition to any temporary walls shown in these documents, temporary walls may be required in areas of construction depending on the type of work being performed in certain areas. See Division 01 50 00-Temporary Facilities for additional requirements.

Award

Educational

$210,000.00

Public - City

Renovation

8

8

4

5

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
35
Bidding Soon
530
All Active Projects
218
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.