BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, new construction and renovation of an educational facility in Mayflower, Arkansas. Completed plans call for the construction of a educational facility.

Alternates 1. Alternate Description: Remove impacted scope of work located in the proposed Dental Suite. Framing, gypsum board, finishing of gypsum board, painting to remain in base bid. Estimated time period for construction is December 2024 - March 2025. Trade Package 1 - Millwork, Trade Package 2 - Storefront, Glass, Glazing - 1. Wood doors. 2. Door hardware , Trade Package 3 - Doors, Frames, and Hardware (Supply) SCOPE OF WORK Subcontractor or Supplier agrees that the Base Bid amount entered above includes the following projectrelated activities and Scope of Work in accordance with the requirements of the specifications, drawings, and CM Manual. Unless noted otherwise subcontractor will furnish all equipment, materials, labor, supplies, tools, scaffolding, hoisting, transportation, unloading, and handling necessary for the proper installation and completion of this work. 1. Provide samples of any exposed wood grain product and all millwork hardware with shop drawings submittal. Specifically request approval of color and finish selections of all laminate and hardware on shop drawings. 2. Visit project site and take field measurements before fabrication. Coordinate and schedule site visit with Project Superintendent. 3. Coordinate all material deliveries and sequence of installation with Project Superintendent no later than 30 days prior to start of work. 4. Furnish and install all cabinet units, shelving units, vanity units, countertops, splashes as indicated in the construction documents. 5. Provide a sufficient amount of scribes and/or fillers as necessary for a complete installation of millwork. 6. Include all associated brackets and supports. 7. Furnish and install finish hardware for millwork and cabinetry including key locks per construction documents. 8. Furnish and install solid surface tops, sills and treads per contract documents. 9. Provide all necessary cut outs for plumbing and electrical fixtures as required, and all cut outs as required for appliances. Provide grommets at cut-outs for power or data cords. 10. Furnish and install approved and matching colored caulking for each color of plastic laminate or solid surface material supplied. 11. Set and adjust all door and drawer margins after installation at the project site. 12. Remove glues and resins, clean out wood and plastic laminate shavings from inside drawers and compartments, and wipe all dust from all millwork immediately after installation. 13. Provide protection of countertops after installation, to be removed at the direction of the Construction Manager. Trade Package 3 - Doors, Frames, and Hardware (Supply) Section A: Trade- Specific Requirements 1. Include cost of freight to jobsite. Coordinate all lay down and staging areas with Project Superintendent at least 48 hours in advance of all material deliveries. 2. Any discrepancy between the hollow metal, hardware and wood door schedules shall be immediately brought to the attention of Project Superintendent. 3. Furnish and deliver all hollow metal frames , including all anchors and accessories. 4. Furnish and deliver all hollow metal doors, wood doors and accessories. 5. All materials must be individually wrapped and protected, and clearly labeled and tagged. 6. All frames and doors must be rated as required and carry the appropriate underwriters label. 7. All doors must be pre-machined for finish hardware, undercut (as required), and pre-finished (if required by construction documents). 8. Include door cutouts, view lite kits, grilles, and stops. 9. Include all transoms and side panels as required. 10. Furnish and deliver all finish hardware, including cylinders for all doors. 11. Furnish and deliver temporary construction cores. 12. Include provisions for final keying. Include cost for coordination meeting with Owner Representative(s). Trade Package 4 - Wood Framing, Drywall, Acoustical 1. Except where found to be in conflict with contract documents, adhere to requirements of the latest edition of the U.S. Gypsum Handbook for installation of gypsum board materials. Advise Construction Manager of all such discrepancies or conflicts in writing immediately. 2. Coordinate any and all framing inspections with local jurisdictions. 3. Include layout for wood stud walls and ceilings. 4. Furnish and install all wood framing members, fasteners, and other accessories as required by the construction documents and as required for a complete wood framing system. 5. Install all framed openings and block-outs in drywall partitions, ceilings, furrdowns, and enclosures as required for the work of other trades. 6. Provide sheathing and gypsum board, moisture-resistant board, drywall control joints, acoustical caulking, high impact gypsum, shaftwall, weather resistant barriers and tile backerboard. 7. Provide UL listed fire rated assemblies as shown. 8. Furnish and install all firestopping, sealant or caulking except for MEPF penetrations in fire rated walls, fire rated enclosures above light fixtures, fire safe insulation if required and fire stop between floors. 9. Provide expansion joints in walls and ceiling joint systems as shown. 10. Furnish and install all batt, blanket type and acoustical insulation per construction documents. 11. Provide complete suspended ceiling framing systems, including all furring channels, hanger rods, flat hangers, wire, grid system, axiom trim, grid wires for light fixtures and other accessories. 12. Maintain true and level ceilings at heights indicated in the construction documents. 13. Coordinate installation of sprinkler heads, light fixtures, speakers, HVAC devices, access doors, and other appurtenances in ceilings. Trade Package 5 - Tile and Commercial Flooring 1. Furnish to Construction Manager a seaming layout plan for approval by Architect. 2. Inspect substrates prior to installation. The start of installation of floor covering will be construed as the applicator's acceptance of the finish floor surface conditions. 3. Perform moisture test and give results to construction manager prior to commencement of work. 4. Provide all surface preparation, leveling, bonding agents and adhesive, carpet tack strips, patterns, transition strips, and other accessories required. 5. Surface preparation, provide and install up to 1 lb. of floorstone per 30SF of flooring. Floorstone not used in one area may be added to another area. Prime surfaces per mfg.'s directions if required. 6. Furnish and install all carpet and padding. 7. Furnish and install all resilient base 8. Provide initial cleaning of resilient materials, carpet, and tile upon completion of installation in strict accordance with the manufacturer's recommendations. 9. Remove visible adhesive, seam sealer, and other surface blemishes using cleaner recommended by carpet manufacturer. Remove protruding yarns from carpet surface. 10. Protect flooring against mars, marks, indentations, and other damage from construction. Use protection methods indicated or recommended by tile manufacturer. 11. Provide "extra stock" materials as identified in the construction documents. Trade Package 6 - Painting and Wallcovering 1. Include surface preparation. 2. Preparation - before applying paint or other surface treatments, clean the substrates of substances that could impair the bond of various coatings, remove oil and grease before cleaning. Do not begin to apply paint until unsatisfactory conditions have been corrected and surfaces are thoroughly dry. Remove efflorescence before painting cementations and masonry materials. Prepare and paint all miscellaneous metals include handrails, stairs, ladders and metal flashing which are not pre-finished. 3. Include taping and finishing of drywall surfaces. 4. Protect all adjacent surfaces against painting. 5. Provide all interior and exterior painting and staining of all surfaces shown to be field finished. Scope includes, but is not limited to, gypsum board, doors, frames, millwork, wood surfaces, metals, exposed concrete. 6. Paint mechanical and electrical equipment, ductwork, conduit and piping as required. 7. Includes touch up of walls, ceilings, and all other painted surfaces as required by industry standards. 8. Include interior caulking at hollow metal frames, window frames, storefront frames, sills and other beauty caulking as needed. 9. Tint each undercoat a lighter shade to simplify identification of each coat when multiple coats of the same material are applied. Tint undercoats to match the color of the finish coat but provide sufficient difference in the shade of undercoats to distinguish each separate coat. Question Deadline 11/07/2024 at 5:00 PM CT Bidders shall submit questions in writing (email is preferred) by the established deadline. Questions should reference specific details, plan sheets, specifications, or bid manual sections.

Post-Bid

Educational

$1,500,000.00

Public - City

New Construction, Renovation, Site Work

18

25

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
19
Bidding Soon
250
All Active Projects
109
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 19, 2024

December 2, 2024

img_map_placeholder

15 Old Sandy Rd, Mayflower, AR


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.