Site work and paving for a road / highway in Tempe, Arizona. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The City Of Tempe Is Evaluating This Project As A Candidate For The Cmaq Pm-10 Funding. The Purpose Of This Project Is To Dustproof 1.05 Miles Of Unpaved Alleys Located Within The University Heights Neighborhood Limits And 1.12 Miles Of Unpaved Alleys Within Hudson Manor Neighborhood Limits. This Project Will Remove Two (2)" Of Existing Alley Surface And Replace It With Double Rolled Recycled Asphalt Pavement (Rap) On The Existing Alley Alignment. The Rap Shall Be Compacted To Existing Grade And Sealed With Dust Palliative/ Stabilizer (Acrylic Copolymer) On Top. A Typical Cross Section Consists Of A 16 To 20-foot-wide Travel Lane Leaving Buffer Of 1 Foot To 2 Feet On Each Side To Avoid Any Utility Conflicts. In Cases Where Typical Cross Section Is Not Fenced Or Linear, The Alleys Will Continue To Be Paved Longitudinally, Leaving The Required One To Two Feet Buffer From Typical Edge Of The Alley. The Finished Grade For Paved Alleys Shall Be Built Flush With The Existing Level Of Manholes, Tops Of Valves And Boxes. The Alleys Are Constructed On Flat Or Level Terrain And Are Generally Composed Of Compacted Course Sandy Or Gravel Soils. Cross Slopes May Vary Within Existing Alleys. The Alley Segments To Be Dust Proofed And Estimated Quantities Are Provided In The Appendices Of The Final Project Assessment Attached As Exhibit A. The Alleys Are Estimated To Have A Current Minimum Average Daily Traffic Of Less Than 25 Vehicles Per Day. Dust Proofing The Existing Alleys Will Not Have Any Impact To The Existing Land Uses. There Are No Anticipated New Right-of-way Or Easements To Be Acquired For This Project. The Existing Drainage Flow Patterns Will Be Maintained Therefore There Are No Anticipated Improvements For Drainage Design. There Is No Utility Relocation Anticipated With This Project. The Clearance For These Items Shall Be Required Through Adot. Design Is Estimated To Be Completed By July 2024 And Construction Would Commence In December 2024. Pavement Striping/markings, Signage, Lighting, Sidewalk Improvements And Ada Improvements Are Not Anticipated To Be Part Of This Project. The City Of Tempe Will Perform Utility Coordination As Needed. The City Of Tempe Will Provide The Following Clearances Through Adot For This Project: R/w Utilities Environmental, Together With Associated Work. Please direct any questions no later than November 5, 2024, by 4:00 p.m., Arizona time, to the City of Tempe Engineering Division at contractor_support@tempe.gov

Post-Bid

Roads / Highways

$1,698,000.00

Public - City

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
24
Bidding Soon
692
All Active Projects
288
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 12, 2024

January 13, 2025

img_map_placeholder

To Be Determined, Tempe, AZ

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.