Site work and paving for a road / highway in Tempe, Arizona. Completed plans call for site work for a road / highway; and for paving for a road / highway.
The City Of Tempe Is Evaluating This Project As A Candidate For The Cmaq Pm-10 Funding. The Purpose Of This Project Is To Dustproof 1.05 Miles Of Unpaved Alleys Located Within The University Heights Neighborhood Limits And 1.12 Miles Of Unpaved Alleys Within Hudson Manor Neighborhood Limits. This Project Will Remove Two (2)" Of Existing Alley Surface And Replace It With Double Rolled Recycled Asphalt Pavement (Rap) On The Existing Alley Alignment. The Rap Shall Be Compacted To Existing Grade And Sealed With Dust Palliative/ Stabilizer (Acrylic Copolymer) On Top. A Typical Cross Section Consists Of A 16 To 20-foot-wide Travel Lane Leaving Buffer Of 1 Foot To 2 Feet On Each Side To Avoid Any Utility Conflicts. In Cases Where Typical Cross Section Is Not Fenced Or Linear, The Alleys Will Continue To Be Paved Longitudinally, Leaving The Required One To Two Feet Buffer From Typical Edge Of The Alley. The Finished Grade For Paved Alleys Shall Be Built Flush With The Existing Level Of Manholes, Tops Of Valves And Boxes. The Alleys Are Constructed On Flat Or Level Terrain And Are Generally Composed Of Compacted Course Sandy Or Gravel Soils. Cross Slopes May Vary Within Existing Alleys. The Alley Segments To Be Dust Proofed And Estimated Quantities Are Provided In The Appendices Of The Final Project Assessment Attached As Exhibit A. The Alleys Are Estimated To Have A Current Minimum Average Daily Traffic Of Less Than 25 Vehicles Per Day. Dust Proofing The Existing Alleys Will Not Have Any Impact To The Existing Land Uses. There Are No Anticipated New Right-of-way Or Easements To Be Acquired For This Project. The Existing Drainage Flow Patterns Will Be Maintained Therefore There Are No Anticipated Improvements For Drainage Design. There Is No Utility Relocation Anticipated With This Project. The Clearance For These Items Shall Be Required Through Adot. Design Is Estimated To Be Completed By July 2024 And Construction Would Commence In December 2024. Pavement Striping/markings, Signage, Lighting, Sidewalk Improvements And Ada Improvements Are Not Anticipated To Be Part Of This Project. The City Of Tempe Will Perform Utility Coordination As Needed. The City Of Tempe Will Provide The Following Clearances Through Adot For This Project: R/w Utilities Environmental, Together With Associated Work. Please direct any questions no later than November 5, 2024, by 4:00 p.m., Arizona time, to the City of Tempe Engineering Division at contractor_support@tempe.gov
Post-Bid
Roads / Highways
$1,698,000.00
Public - City
Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 12, 2024
January 13, 2025
To Be Determined, Tempe, AZ
Related To This Project
Tempe, AZ
Bid Date: Nov 21 2024
Tempe, AZ
Bid Date: Nov 12 2024
Tempe, AZ
Bid Date: Jan 15 2020
Tempe, AZ
--
Tempe, AZ
Bid Date: Nov 12 2024
Tempe, AZ
Bid Date: Nov 07 2024
Tempe, AZ
--
Tempe, AZ
Bid Date: Nov 06 2024
Tempe, AZ
Bid Date: Oct 31 2024
Tempe, AZ
--
Tempe, AZ
--
Tempe, AZ
--
Tempe, AZ
--
Tempe, AZ
Bid Date: Nov 12 2024
Tempe, AZ
Bid Date: Nov 12 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.