BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Oklahoma City, Oklahoma. Working plans call for the renovation of a municipal facility.

**ONLY AVAILABLE TO TINKER AFB MAC BOA HOLDERS** TAFB MAC BOA CONTRACTORS, Please see the attached document for the Tinker MACB Project: WWYK200323-REPAIR HVAC DIFFUSER AND DUCTWORK, B3001 POST P51-R59. **ONLY TINKER AFB MAC BOA HOLDER MAY ATTEND THE SITE VISIT AND PROPOSE** 1. Site visit attendance by the MAC BOA Prime Contractor is mandatory to be considered responsive. Please respond to provide an RSVP response with the number of Prime Contractor and Sub-Contractor personnel expected to attend to the below points of contact (POC) with confirmation of intent to attend the initial site visit NLT 2:00pm CST, Friday 8 November 2024. If a MAC BOA Prime Contractor fails to meet this RSVP deadline, the initial site visit information will not be released to your organization. 2. Attached you will find an Entry Authorization List (EAL) Excel spreadsheet, please fill in all information for individuals who will need base access that do not currently have base access to include any Prime Contractor and Sub-Contractor personnel that plan on attending the initial site visit. Provide email copy of the Excel spreadsheet to the below POCS NLT 2:00pm CST, Tuesday 12 November 2024. 3. Estimated Initial Site visit date: (21 November 2024). A meeting invite will be sent out with the firm initial site visit date and time to all Prime Contractors that respond per paragraph 1 above. Do not make travel plans until the firm initial site visit date/time is provided. 4. IAW MAC BOA guidelines; Small Business Set-Aside. (If >$25 mil). 5. IAW FAR 36.204(e): The estimated price should be described in terms of the following price range: Between $1,000,000 and $5,000,000. **ONLY TINKER MACBOA HOLDERS CAN ATTEND AND PROPOSE ** *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Municipal

$5,000,000.00

Public - Federal

Renovation

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
60
Bidding Soon
460
All Active Projects
215
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 6, 2025

img_map_placeholder

To Be Determined, Oklahoma City, OK


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.