Published January 16, 2025 at 7:00 PM

Updated January 18, 2025

Site work for a civil project in Mill Creek, Oklahoma. Completed plans call for site work for a water / sewer project.

Question Deadline 12/05/2024 Questions received less than seven days prior to the date for opening of Bids may not be answered. The Project includes the following Work Installation of 6 and 2 water main, meter vault and appurtenances. Drilling of one municipal water well with well house and appurtenances and rehabilitation of two existing water wells. Bids Received More Than Ninety-six (96) Hours Prior to the Bid Opening Will Be Returned. All Bids Received at Said Time Will Be Opened and Evaluated for Completeness and Correctness. All Work Shall Be Performed and All Construction and Materials Used and Furnished Shall Be in Accordance With the Contract Documents Prepared by Wall Engineering, Llc. The Contract is to Be Awarded to the Lowest, Responsive, Responsible, Bidder. The Owner Reserves the Right to Correct Any Non-material Clerical Errors in the Bidding as Allowed Under Oklahoma Law. The Owner Reserves the Right to Reject Any and All Bids in Accordance With the Oklahoma Public Competitive Bidding Act of 1974. Conditional Bids Shall Not Be Accepted. The Project Includes the Following Work: Installation of 6" and 2" Water Main, Meter Vault and Appurtenances. Drilling of One Municipal Water Well With Well House and Appurtenances and Rehabilitation of Two Existing Water Wells. Funding for This Project is Provided Through American Rescue Plan Act (Arpa) Grant Program. As Such, Compliance With Labor Standards Contract Provisions is Mandatory. Each Bidder Shall Accompany His Original Bid, Filed With the Mill Creek Public Works Authority, With a Certified or Cashier's Check on a Solvent Bank Located in Oklahoma, or a Bidder's Bond, in the Amount of Five (5) Percent of the Amount Bid, as a Guarantee of His Ability to Perform the Contract Bid Upon, and That He Will Enter Into a Written Contract With the Owner to Perform Said Work and/or Furnish Said Materials in Accordance With Said Plans and Specifications, and Furnish the Required Bonds According to the Public Competitive Bidding Act of 1974. The Owner Will Retain the Deposit for Liquidated Damages in Case the Successful Bidder Fails to Enter in Said Contract and Furnish the Required Bonds Provided for in the Specifications Within the Time Required. Deposit of the Unsuccessful Bidders Will Be Returned Upon the Execution of the Contract and Required Bonds. Construction, Maintenance and Statutory Payment Bonds in the Amount of 100% of the Contract Price Are Required for This Project. These Bonds Must Be Obtained From a Corporate Surety Licensed in Oklahoma, and Approved by the Owner and Consulting Engineer. The Bidder Shall State in the Proposal the Name and Address of the Surety or Sureties Who Will Sign This Bond in Case the Contract is Awarded. The Maintenance Bond Required Will Guarantee the Repair of All Damage Due to Improper Materials or Workmanship for a Period of One (1) Year After the Acceptance of the Work by the Owner. This Project is to Be Financed by the Arpa Funds. The Following Requirements and Regulations Must Be Complied With: Equal Opportunity in Employment: All Qualified Applicants Will Receive Consideration for Employment Without Regard to Race, Color, Religion, Sex, National Origin, Age or Physical Handicap. Bidders on This Work Will Be Required to Comply With the President's Executive Order No. 11246, as Amended. Each Bidder Must Fully Comply With the Requirements, Terms and Conditions of the Environmental Protection Agency's Disadvantaged Business Enterprise Requirements, Which Have Been Adopted for the Owrb Arpa Program, and Include Employing the Six (6) Good Faith Efforts and Soliciting Disadvantaged Business Enterprises During the Performance of This Contract.

Award

Water / Sewer

$1,248,203.00

Public - City

Site Work

24

20

6

5

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Manufacturer Qualifications, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Existing Products, Cleaning and Waste Management, Site Maintenance, Final Cleaning, Closeout Submittals, Bonds, Spare Parts, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Precast Concrete, Mass Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Wood, Plastics, and Composites, Common Work Results for Wood, Plastics, and Composites
Division 08 - Openings

Division 08 - Openings

Windows, Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Furnishing Accessories, Bowls
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Lighting
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Electrical Utilities, Utility Substations, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
23
Bidding Soon
418
All Active Projects
203
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 12, 2024

February 10, 2025

img_map_placeholder

To Be Determined, Mill Creek, OK

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

ARPA Water System Improvements Bids

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.