BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 17, 2025 at 8:00 PM

Updated September 18, 2025

Renovation of an educational facility in Allen, Texas. Conceptual plans call for the renovation of a primary / secondary education facility.

Full campus renovations at the following schools: Curtis Middle School Ford Middle School* Olson Elementary Cheatham Elementary Green Elementary Norton Elementary Anderson Early Childhood School *Note: Ford Middle School renovation include installation of turf surface and running track, as Ford is the only Allen ISD middle school without a turf or track. Renovation to existing Allen ISD Activity Complex Construction of Allen ISD Multi-Purpose Complex Mechanical, Electrical, and Plumbing Repair, Replacements, and Efficiencies at several campuses Roofing and Waterproofing at several campuses to prevent water infiltration into the building envelope Concrete and Foundation Repairs at several campuses Grounds and Irrigation Replacement, Repair, and Efficiencies Food Service Equipment Repair and Replacement Playground Equipment Repair, Replacements, and Additions Purchase New School Buses and Department Vehicles Purchase New Bus Rider Camera System Vehicle Maintenance Equipment Lifts, tools, and diagnostic technology that allows for vehicle maintenance in-house. Life Safety Systems Upgrades - Equipment and systems include AEDs, Fire Alarms, Fire Suppression, and Fire Panels Security Camera System Upgrades and Additions to replace and upgrade cameras that are at the end of their life cycle Enhance Campus Technologies, such as Campus IP-Based Bell PA & Multimedia Notification System Classroom Media Stations & Campus Print Devices Classroom Technologies, including Interactive/Multimedia Displays & A/V Upgrade Network Infrastructure upgrades Data Center Infrastructure upgrades Lowery Tennis Court Replacement, including installation of tiered seating for viewing and striping the court for pickleball for community usage This project is part of the school district’s bond that passed. As of September 17, 2025, it is currently unknown if an architect, construction manager, and general contractor have been contracted with the school district. Further details regarding design and construction timelines have not been released.

Conceptual

Educational

$419,062,253.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
370
Active Projects
178
Bidding Soon
3,801
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.