EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 19, 2025 at 7:00 PM

Updated October 1, 2024

Site work for a municipal facility in Conway, South Carolina. Completed plans call for site work for a 2,000-square-foot municipal facility.

Reference Number 0000368317 Canine grade artificial turf for use in pet areas. Approximately 2,000 square feet for Horry County Animal Care Center. See additional documents for specifications and scope of work. Delivery Point 1923 Industrial Park Rd. Conway SC 29526 Question Acceptance Deadline 01/07/2025 02:00 PM EST Questions are submitted online Yes General Requirements - Contractors License Required - Installation Required - Insurance Required - License Required - Samples Required - Warranty Information Required DESCRIPTION OF WORK The contractor shall provide all labor, materials, equipment, and tools necessary for the complete installation of a "no infill" synthetic grass dog surface with a stable draining base. The complete synthetic grass system shall consist of, but not necessarily be limited to the following: A. Approximately 2,000 square feet of artificial turf work as shown on the drawings. B. Subgrade, base, and drainage construction as specified in Section 2 and Section 3 of this document. C. Quality synthetic grass product manufactured in the USA according to specifications in Section 2 of this document. Product shall be a knitted synthetic grass product (not tufted) and contain an antimicrobial agent while meeting or exceeding all guidelines as established herein. For characteristics not specifically stated, they shall meet or exceed all guidelines published by the Synthetic Turf Council. D. The synthetic grass surface shall be specifically designed, manufactured, and installed for the intended use as a commercial/high use dog surfacing solution. E. Plastic perimeter sloped area 2' around perimeter to prevent any tripping hazard and meet ADA requirements. F. Plastic perimeter boards ("2x4" or "2x2" set vertically) are to surround the entire area for anchoring of the turf. The top edge of this surface is to be a minimum of 1/2" below any adjacent solid walking surfaces where there could be foot traffic. G. Stainless steel staples, 1" in length, are to be used to anchor the synthetic turf to the perimeter boards. Or removable nonmetallic tack strip.

Post-Bid

Municipal

$1,400,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
42
Bidding Soon
463
All Active Projects
209
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.