EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 18, 2024 at 7:00 PM

Updated October 1, 2024

Site work and new construction of a pre-engineered storage facility in Nottingham, Pennsylvania. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

Salt Storage Building Project The project is for supply and installation of a new building, approximately 40' x 62' in size, on the Township's property at 100 Park Road. The building design includes precast T-walls, wood framing, a concrete floor slab, a 20' concrete apron, and miscellaneous construction as indicated on the construction drawings. Alternate bid items for backfill and a thickened floor and approach slab are requested. Question Deadline 11/29/2024-If any Bidder fails to fully understand any clause or requirement set forth in the Contract Documents, such Bidder shall make inquiry to the Engineer for an interpretation in advance of the submission of the bid. Every request for such interpretation shall be in writing via the PennBid Program and to be given consideration shall be received at least five (5) calendar days prior to the date fixed for the opening of bids. Estimated Contract Value: $300,000 The successful bidder will be required to pay the online Program a fee of 1/3% of the contract value award. There is a minimum award fee of $100.00 and a maximum of $5,000.00. Proposals shall be accompanied by a Bid Bond in the amount of ten percent (10%). Proposals shall be effective for 90 days from the date of opening. The successful low bidder will be required to provide a Performance Bond equal to one hundred percent (100%), a Labor and Material Payment Bond equal to one hundred percent (100%), a worker's compensation affidavit, and a certificate of insurance naming WEST NOTTINGHAM TOWNSHIP and LTL Consultants, Ltd. as additional insureds, all within 20 days after the contract is awarded. A Maintenance Bond equal to fifteen percent (15%) of contract price and extending for a period of 18 months after substantial completion is required. WEST NOTTINGHAM TOWNSHIP reserves the right to waive any non-material defects or irregularities in the bid, and to reject any or all bids or portions thereof. WEST NOTTINGHAM TOWNSHIP, in accordance with Title VI of the U.S. Civil Rights Act of 1964 and Parts 21 and 23 of 49 C.F.R., notifies all bidders that it will affirmatively ensure that MBE/WBE will be afforded full opportunity to submit bids in response to this invitation and that no person will be discriminated against on the grounds of race, color, sex or national origin in consideration for an award. Project is to be substantially completed by FRIDAY, JUNE 6, 2025. Liquidated damages apply at the rate of $400.00 per calendar day. Proposals must include the Public Works Employment Verification Form completed by the Bidder.

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$272,800.00

Public - City

New Construction, Site Work

8

8

6

4

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution, Application, Closeout Submittals, Bonds
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 10 - Specialties

Division 10 - Specialties

Storage Specialties, Postal Specialties
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Backfill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Plants, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
314
Active Projects
169
Bidding Soon
2,712
All Active Projects
1,268
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 4, 2024

December 23, 2024

img_map_placeholder

100 Park Rd, Nottingham, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Salt Storage Building Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.