Published November 6, 2025 at 7:00 PM
Updated November 7, 2025
Site work for a water / sewer project in Wilmington, North Carolina. Completed plans call for site work for a water / sewer project.
Cape Fear Public Utility Authority (CFPUA) intends to procure a qualified Design-Builder (DB) to provide design and construction services for the installation of two separate 16-inch diameter water main interconnections in the Bayshore area to extend our distribution system and provide safe, reliable drinking water to adjacent, unserved properties and neighborhoods impacted by PFAS. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Questions pertaining to the selection process should be directed to Procurement Manager at bids@cfpua.org no later than 2:00 PM on November 19, 2024. Project Description: The scope of this project includes the design, permitting, and construction of two separate 16-inch diameter water main interconnections in the Bayshore area to provide public drinking water access to adjacent, unserved properties and neighborhoods that are impacted by PFAS. Total Estimated Design-Build Project Budget: $7,000,000 to $10,000,000 The selected Design Builder (DB) will form a team with CFPUA and execute preliminary and final comprehensive agreements for design and construction of the aforementioned 16-inch diameter water mains along Market St./Bayshore Dr. and Furtado Dr. for a total project cost not to exceed approved budget amount. The project scope of work generally includes, but is not limited to, the following primary tasks: 2.1.1 This project will entail planning, design, permitting, construction management, and construction of 16-inch diameter water main interconnections in the Bayshore area to provide public drinking water access to adjacent, unserved properties and neighborhoods that are impacted by PFAS. Planning, design, constructability studies and reviews, permitting, bidding, easement and right-of-way mapping, etc. for water main and service installations in accordance with applicable technical standards and administrative requirements of the CFPUA, New Hanover County, City of Wilmington, NCDOT, etc. Experience with water distribution projects in an active urban environment is required. 2.2.2 Construction cost analyses and estimation based on marketplace conditions, value engineering guidance, and best value recommendations throughout the design and construction phases. Demonstrated capacity to accurately estimate project costs and effectively deliver capital projects of this nature on time and within budget is relevant to the selection.
Award
Water / Sewer
$1,094,199.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 30, 2024
March 1, 2026
To Be Determined, Wilmington, NC
Related To This Project
Wilmington, NC
Bid Date: Nov 14 2024
Wilmington, NC
Bid Date: Dec 12 2024
Wilmington, NC
Bid Date: Nov 27 2024
Wilmington, NC
--
Wilmington, NC
--
Wilmington, NC
Bid Date: Nov 27 2024
Wilmington, NC
Bid Date: Nov 19 2024
Wilmington, NC
Bid Date: Dec 02 2024
Wilmington, NC
Bid Date: Dec 10 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.