BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 16, 2024 at 7:00 PM

Updated December 17, 2024

Site work and paving for a mixed-use development in Downers Grove, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The location of the services to be performed for this contract is the Jane Addams Memorial Tollway (I-90) between Mile Post 77.4 and Mile Post 78.5 and the Tri-State Tollway (I-294) between Mile Post 40.0 and Mile Post 41.1 in Cook County, Illinois.. The work under this contract includes ramp pavement and shoulder replacement; removal of the existing toll plaza median islands, equipment, and canopies; construction of barrier wall extensions; installation of toll plaza monotubes, lighting, pavement marking and signing; toll plaza electrical work; landscaping, erosion control, and maintenance of traffic. Bidders may be required to be pre-qualified by the Illinois Department of Transportation (IDOT). IDOT Prequalification required: Yes Questions pertaining to the intent of the contract documents may be sent to the Illinois Tollway, attention 4804D.4970_Questions@docs.e-builder.net, to be received no later than 2:00 p.m. local time on November 22, 2024. The work to be done under this contract shall be started on or about March 24, 2025. All work under this contract shall be completed by September 2, 2026. A completed Questionnaire and a statement of current contractual obligations on forms supplied by the Illinois Tollway will be required from the apparent low bidder once the apparent low bidder is determined. Each bid must be accompanied by a Bid Guaranty in the amount of five (5%) percent of the total amount shown in the bid for the contract. The Bid Guaranty shall be in the form of an acceptable bid bond or a bank draft, certified check or cashier's check drawn on a solvent bank made payable to the Illinois State Toll Highway Authority. Award of the above contract, if any award be made, will be to the lowest responsive and responsible bidder or bidders. The Illinois Tollway reserves the right to reject any and all bids, to waive technicalities, or cancel the solicitation.

Post-Bid

Roads / Highways

$1,000,000.00

Public - State/Provincial

Paving, Site Work

1137

9

7

5

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
452
Active Projects
243
Bidding Soon
3,322
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 13, 2024

March 24, 2025

Project location map

Multiple Locations, Downers Grove, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.