BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 27, 2025 at 8:00 PM

Updated June 28, 2025

Renovation of a medical facility in Columbus, Ohio. Completed plans call for the renovation of a medical facility.

As of June 27, 2025, a design/build firm was awarded and construction began May 5, 2025. A firm timeline for completion has not been detemined. *The closed solicitation has been included below for reference: Submit all questions regarding this RFQ in writing to Brendan Flaherty at flaherty.12@osu.edu with the project number and name included in the subject line (no phone calls please). For this project, the Owner will be requesting a Competitive GMP at the time of Request for Proposal as part of the Best Value selection process. The Ohio State Wexner Medical Center is looking for interested Design Build Contractors for East Tower - AHU 1, 2, 3 Replacement project.at 181 Taylor Avenue, Columbus, Ohio. This project will replace three Air Handling Units in the OSU East Tower Hospital. All the AHU's will be required to be tied into the BAS system with DDC Controls. This project will replace three Air Handling Units, AH-1, AH-2, and AH-3, in the East Hospital Tower second floor mechanical room. AH-1 and AH-2 are [32,000 CFM and 25,000 CFM (respectively)] dual duct units serving the basement, ground, 1st, and 2nd floors of the tower. AH-3 is a [12,500 CFM] makeup air unit serving the patient rooms on floors 3 through 9. These units will be replaced in a phased implementation beginning with AH-3 in summer/fall 2025. The hospital's HVAC systems are required to operate continuously throughout the project, requiring the use of temporary packaged HVAC equipment located outdoors adjacent to the mechanical room to back feed the systems. The new air handling units will be fully custom knockdown or built-in-place units with mixing/prefilter section, hydronic heating and cooling coils, steam humidifier, supply air fan array with n+1 VFD, and MERV 14 final filters. The project will also include replacement of existing inline return air fans and intake/relief dampers which are located external to the unit.

Under Construction

Medical

$3,899,262.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
218
Active Projects
115
Bidding Soon
1,586
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2025

Project location map

81 Taylor Ave, Columbus, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.