BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 22, 2024 at 7:00 PM

Updated November 27, 2024

This is a service / maintenance or supply contract in Everett, Washington. Contact the soliciting agency for additional information.

PWC - 2025-2027Unit Price Directional Boring Contract The District cannot guarantee internet access. It is strongly recommended that you respond 24 hours prior to the bid closing date and time for submittal. The District is unable to verify if a bid has been successfully uploaded in online. system places all submissions into a virtual lock box where they cannot be viewed by the District until after the due date and time. Bidders can check their submission by returning to the home page of Ponline. The bid will be shown in the "Bids Responding To" section. DO NOT EMAIL A COPY OF YOUR BID TO THE DISTRICT. The online will not allow bids to be uploaded after the due date and time established. Bidders accept all risks for uploading their quotation by the established due date and time. If a Bidder uploads a file to online , it is the Bidder's responsibility to ensure the file is not corrupt or damaged. If the District is unable to open an attachment because it is damaged, corrupt, infected, etc., the District may disqualify the Bidder's submission. Engineer's Estimate: $4,500,000.00 Project Description: This multi-year contract consists of providing all labor, supplies, tools, equipment, bore conduit, and incidentals necessary to install approximately 20,000' of conduit via directional boring as directed by the DISTRICT. The targeted work will include small to medium size road bores, depreciated cable replacement, relocation and conversion, and system projects. The location of the work is within the boundaries of the DISTRICT'S service area, which includes all of Snohomish County and the Camano Island Portion of Island County. Contractors must be prequalified prior to bidding on this prequalified work for "Underground (Directional/Conventional Boring)".

Post-Bid

Water / Sewer

$6,000,000.00

Public - County

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
202
Active Projects
83
Bidding Soon
1,979
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 26, 2024

January 27, 2025

Project location map

Multiple Locations, Everett, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.