BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 7, 2025 at 7:00 PM

Updated January 8, 2025

Site work for a water / sewer project in Brandon, Mississippi. Completed plans call for site work for a water / sewer project.

2024 Hwy 80 Waterline Improvements for supplying all labor, equipment, and materials necessary for completion of the 2024 HWY 80 Waterline Improvements project. Bidders must be qualified under Mississippi State Law and show Certificate of Responsibility issued by the Mississippi State Board of Public Contractors. Project includes but is not limited to the installation of approximately 2,200 linear feet of waterline consisting of 10" C-900 water main, 10" C-900 HDPE DR-11 directional bored water main, and all other associated work required to complete the project as shown and specified in the plans and contract documents. Bid Security in the amount of 5% of the bid must accompany each bid in accordance with the INTRUCTIONS TO BIDDERS. Attorneys-in-fact who sign Bid Bonds, Payment Bonds or Performance Bonds must file with each bond a certified and effective dated copy of their Power of Attorney. Minority and Woman Owned Business Enterprises are solicited to bid on this contract as prime contractors and are encouraged to make inquiries regarding potential subcontracting opportunities, equipment, material and/or supply needs. The City of Brandon is an Equal Opportunity Employer, and hereby notifies all bidders will be afforded the full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, sex, national origin, age, disability, sexual preference, marital or veteran status, or any other legally protected status in consideration for an award. No prospective CONTRACTOR may withdraw his proposal within SIXTY (60) DAYS after the actual date of the opening thereof. Each bidder shall write the Certificate of Responsibility number and Mississippi Contractors License number on the outside of the sealed envelope containing his proposal. Proposals shall be submitted in duplicate, sealed, The CITY OF BRANDON reserves the right to waive any information or irregularities, to accept any bid deemed to be in the best interest of the City, or to reject any or all bids. The Contract Time is Seventy-Five (75) consecutive calendar days with liquidated damages being Five Hundred Dollars ($500) per calendar day thereafter. All questions about the meaning or intent of the Contract Documents are to be directed in writing or via email to Engineer (jwolf@benchmarkms.net).

Award

Water / Sewer

$386,775.00

Public - City

Site Work

11

8

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
35
Bidding Soon
393
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 9, 2024

January 8, 2025

Project location map

US-80, Brandon, MS

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.