Published January 29, 2025 at 7:00 PM

Updated January 31, 2025

Renovation of a water / sewer project in Golden Valley, Arizona. Completed plans call for the renovation of a water / sewer project.

Mohave County on behalf of the Golden Valley Improvement District (GVID) seeks a qualified contractor for construction services to complete Well #2 replacement site upgrades to equip the new GVID Well No. 5. This project is to fully equip the newly drilled GVID Well #5 and tie it into the existing Well #2 and existing arsenic treatment system. Project Address 1506 S TEDDY ROOSEVELT RD GOLDEN VALLEY, AZ 86413 Background The Golden Valley County Improvement District No. 1 (the "District") has two active water wells, Well No. 1 and Well No. 2, that it uses to provide domestic water service to its customers. There are approximately 1,600 metered customers and 350 customers that dispense water from the District's three standpipe facilities. Well No. 1 produces approximately 680 gallons per minute. The original production capacity of Well No. 2 was approximately 625 gallons per minute. The current production capacity for Well No. 2 is between 150 gallons per minute and 170 gallons per minute. Furthermore, Well No. 2 does not have sufficient pumping head to lift water into the high tanks that gravity feed the majority of the District's customers. Well No. 2 present day pumping capacity has left the District's distribution system without a redundant source of water, making it vulnerable to water shortages when Well No. 1 fails. In March - April 2024, the District facilitated successful drilling of a new groundwater production well to 1,189 feet, and the final caliper log shows precise, plumb drilling result. Well No. 5, on the same property as Well No. 2 at 1506 S. Teddy Roosevelt Road (southwest corner of Bolsa Drive and Teddy Roosevelt Road) which is APN 306-19-001. The District maintains driller daily summaries and penetration logs, caliper log, one zonal sample chemistry and hydraulic conductivity report, and as-built well as drilled and cased. There is an arsenic treatment facility located at Well No. 2. The treatment system blends treated water with untreated water pumped directly from the well to decrease arsenic concentrations below the U.S. Environmental Protection Agency Maximum Contaminant Level of 10 micrograms per Liter. The District anticipates but has not confirmed groundwater pumped from Well No. 5 will require arsenic treatment via the existing onsite plant at Well No. 2. The District's overarching goal is to create a structurally stable, long-lasting, efficient well that functions at the desired volume and quality and enables ease of operation and maintenance. Well No. 5 is registered with Arizona Department of Water Resources as Well No. 55-930804 This Project - design and construction - is funded through American Recovery Plan Act (ARPA) monies. Question Deadline 11/19/2024 at 12:00 PM MT Questions must be directed to: Dusty Lewis, (928) 753-0752, lewisd@mohave.gov The District seeks construction services to complete well site upgrades to equip the new GVID Well No. 5. This includes site improvements to secure the well site within a chain link fence, utility connections, water system distribution system connection, arsenic treatment plant connection, and pump wellhead and appurtenant instrumentation and controls. The contractor shall be required to complete the site improvements per specifications and plans provided, as well as any additional information provided in this bid solicitation. This project is to fully equip the newly drilled GVID Well #5 and tie it into the existing Well 2 and existing arsenic treatment system. Well 2 shall not be down for a period longer than 30 calendar days, and Liquidated Damages will occur should it exceed 45 calendar days.

Award

Water / Sewer

$1,407,795.00

Public - County

Renovation

35

20

41

4

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
2
Bidding Soon
270
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 5, 2024

January 6, 2025

Project location map

1506 Teddy Roosevelt Rd, Golden Valley, AZ

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.