BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Cupertino, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The bid opening for this project is set to be in-person only at City Hall. Location and Description. The Project is located at Stevens Creek Boulevard between De Anza Boulevard and N. Wolfe Road/Miller Avenue and is described as follows: The project will convert the existing Class II-B buffered bike lanes to Class IV separated bikeway by installing physical separators/curbs between the bike lane and vehicular traffic, modifying existing traffic signals with exclusive bicycle signals, and constructing a shared cycle track bus stop. Time for Final Completion. The Project must be fully completed within 60 working days from the start date set forth in the Notice to Proceed. City anticipates that the Work will begin on or about March 2025, but the anticipated start date is provided solely for convenience and is neither certain nor binding. Contractor shall procure long lead time materials including but not limited to signal poles, signal mast arms, and precast concrete blocks as soon as construction contract is awarded. Notice to Proceed will be coordinated to ensure materials will arrive in a timely manner for the work to be completed within the allowed working days. Estimated Cost. The estimated construction cost is $1,500,000. Disadvantaged Business Enterprises (DBE). The DBE contract goal for this project is 17%. License and Registration Requirements. 3.1 3.2 License. This Project requires a valid California contractor's license for the following classification(s): Class A - General Engineering Contractor, C-10 Electrical Contractor for all traffic signal work. DIR Registration. City may not accept a Bid Proposal from or enter into the Contract with a bidder, without proof that the bidder is registered with the California Department of Industrial Relations ("DIR") to perform public work pursuant to Labor Code 1725.5, subject to limited legal exceptions. Question Deadline 11/28/2024 Questions or requests for clarifications regarding the Project, the bid procedures, or any of the Contract Documents must be submitted in writing to Jason Wong, P.E., Senior Civil Engineer, at JasonW@cupertino.gov.

GC Bidding

Roads / Highways

$1,500,000.00

Public - City

Paving, Site Work

19

19

16

5

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
131
Active Projects
71
Bidding Soon
1,423
All Active Projects
535
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 5, 2024

March 3, 2025

img_map_placeholder

Stevens Creek Blvd, Cupertino, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.