BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Broken Arrow, Oklahoma. Completed plans call for the renovation of a educational facility.

All Bidders for this project are required to comply with all aspects of the Public Competitive Bidding Act and to meet all qualification requirements as established in the bid documents. Furthermore, each Bidder may not withdraw his bid within 30 days after the actual date of the opening of bids. Bids will be publicly opened and read aloud at the abovementioned location following closing time stated above. Bids received more than ninety-six (96) hours, excluding Saturdays, Sundays, and holidays, before the time set for opening bids, as well as bids received after the time set for opening bids, will not be considered and will be returned unopened. Upon receipt of an acceptable bid, the contract will be awarded within thirty (30) days after the opening of bids and the written contract executed within ten (10) days thereafter. The district reserves the right to waive any informality, or to reject any or all bids. The purpose of this bid is to provide all labor, material, equipment and subcontractors to replace one (1) complete "split" HVAC system (furnace/condenser/evaporator), and six (6) rooftop gas package units at Oliver Middle School, 3100 W New Orleans, Broken Arrow, OK 74011. The equipment shall be Lennox equipment or Trane equivalent. Please see included Lennox submittal sheets. Oliver Middle School has a building automation system that controls the HVAC equipment. Panco Automation shall assist with the removal and reinstallation of these controls. The cost of their services shall be included in the price of the project. Work can begin on June 2nd and should be completed by June 20th. The expectation is that the equipment shall be ordered as soon as the project is awarded to the winning contractor. This is to ensure that the equipment will be ready to be installed in June. If the equipment arrives early, the contractor will be responsible for storing the equipment until the project begins. Please take note of the included Broken Arrow Public Schools split system and rooftop unit requirements located on pages 6-7 Questions can be sent electronically to esapp@baschools.org. All questions and answers will be published and provided to all vendors as soon as possible.

Sub-Bidding

Educational

$300,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
44
Bidding Soon
677
All Active Projects
266
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 3, 2024

June 2, 2025

img_map_placeholder

3100 W New Orleans St, Broken Arrow, OK


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.