BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 19, 2024 at 7:00 PM

Updated November 20, 2024

Site work for a civil project in Taylor, Nebraska. Completed plans call for site work for a bridge / tunnel; and water / sewer project.

As of November 19, 2024 project was awarded to Kokes Construction LLC, but awarded amount is not available. The project is referred to as "Taylor Southeast, C-58(46)" and shall include all labor, materials, transportation and equipment required to furnish and install: C-58(46) - triple 84" x 70' corrugated metal pipes on a 10-degree skew (rhb), with steel headwalls attached and wingwalls Furnishing and installation of corrugated metal pipes with steel headwalls attached, wingwalls and other related incidental work at one site in Loup County, Nebraska. The project site is located: C-58(46) - on 823rd Road between 458th Avenue and 459th Avenue in Loup County, Nebraska. Along with its Bid Proposal, each bidder shall submit an unconditional Bid Bond or Certified Check made payable to the County Treasurer of Loup County, Nebraska, in an amount equal to five (5) percent of the Bid Proposal. The desired completion date for the project is May 1, 2025. The successful bidder (i.e. Contractor) will be allowed forty (40) calendar days for completion of the project after beginning work at the site, provided they do not exceed their specified completion date. Additional days due to weather may be granted at the discretion of the Engineer. Within ten (10) days following the award of the Contract, the successful bidder shall furnish a surety bond or bonds in an amount equal to or greater than the full amount of the contract. The surety and form of the bonds are subject to acceptance by the Loup County Board of Commissioners The Loup County Board of Commissioners reserves the right to reject any and all bids or to waive any irregularities in bids received. Award of the Contract will be in accordance with the County Purchasing Act's competitive bidding considerations as set forth in Neb.Rev.Stat.

Award

Bridges / Tunnels

$200,000.00

Public - County

Site Work

14

3

2

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
12
Bidding Soon
126
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 13, 2024

December 13, 2024

Project location map

Multiple Locations, Taylor, NE

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.