BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 18, 2024 at 7:00 PM

Updated November 27, 2024

Renovation of an educational facility in London, Ontario. Completed plans call for the renovation of a educational facility.

OHR - Door Hardware Replacement with New Salto locks A. The hardware supplier shall supply and install to the project all items of architectural finishing hardware specified herein. Scope of work includes the removal, partial turnover of existing hardware to owner, disposal of remaining existing hardware, the preparation of frames and/or doors for new hardware, installation of hardware power supplies and Integration Modules (IM), low voltage wire, wire mold and terminations of door hardware components to the IM. B. The hardware supplier shall take on the responsibility of the door supplier, and supply, deliver, handle, move and install all doors listed in the finish hardware schedule. The hardware supplier shall site measure all doors and frames, and submit formal shop drawings for review by the owner. Disposal of all existing doors is also the responsibility of the hardware supplier. C. The hardware supplier will be required to provide the Owner with electronic copies of riser and schematic wiring diagrams for all electrical hardware opening systems. Provide written Descriptions of Operation (DOO) for each electrified door opening for approval. Include all as- built versions of all drawings and DOO in project close out documents. D. The hardware supplier shall meet with the Owner, subcontractors, and owner's representatives to instruct and coordinate the supply and installation of all electric hardware components. E. The successful bidder shall take on full responsibility of project, ensuring that all hardware is functional and working as intended by owner. The successful bidder shall include all hardware components and labour to complete the project, including, but not limited to the products listed in the finish hardware schedule. No extras will be accepted unless a formal change order is issued by owner. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform. Question Acceptance Deadline: 2024/11/21 04:00:00 PM EST Brandon Dejong, Project Coordinator Cell: 519-318-7041 or email: bdejong8@uwo.ca

Post-Bid

Educational

$50,000.00

Public - State/Provincial

Renovation

9

4

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
161
Active Projects
68
Bidding Soon
1,458
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 26, 2024

January 6, 2025

Project location map

230 Sarnia Rd, London, ON

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.