EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 4, 2024 at 7:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Eufaula, Alabama. Completed plans call for site work for a water / sewer project.

Phase 1 - Scope of Work: Rehabilitation of approximately 22,900 Linear Feet of Sanitary Sewer and three (3) lift stations to include the following: Rehabilitation of approximately 22,900 Linear Feet of Sanitary Sewer and three (3) lift stations to include the following: o Pre and Post Closed-Circuit Television (CCTV) Cleaning and Inspections o 16,500 LF - 8" Gravity Sewer Pipe - Rehabilitated by CIPP Liner o 6,400 LF - 4" Service Laterals - Rehabilitated by CIPP Liner o Manhole Repair and Rehabilitation o Point Repair at Various Depths o Installation of new submersible pumps and associated controls o Lining of existing wet wells o Installation of new control valve vaults o Installation of chain-link perimeter fencing Phase 2 - Scope of Work - Rehabilitation of approximately 14,000 Linear Feet of Sanitary Sewer and three (3) lift stations to include the following o Pre and Post Closed-Circuit Television (CCTV) Cleaning and Inspections o 11,500 LF - 8" Gravity Sewer Pipe - Rehabilitated by CIPP Liner o 2,500 LF - 4" Service Laterals - Rehabilitated by CIPP Liner o Manhole Repair and Rehabilitation o Point Repair at Various Depths o Installation of new submersible pumps and associated controls o Lining of existing wet wells o Installation of new control valve vaults o Installation of chain-link perimeter fencing The Owner requires the Project to be completed in 540 calendar days from date of Notice to Proceed. The Contractor will be allowed to choose a start date to commence no later than May 1, 2025. Details regarding the Notice to Proceed timing and material procurement flexibility are included in the Bid Documents. Bids must be submitted on proposal forms furnished by the Engineer or copies thereof. All bidders bidding in amounts exceeding that established by the State Licensing Board for General Contractors must be licensed under the provisions of Title 34, Chapter 8, Code of Alabama, 1975, and must show evidence of license before bidding or bid will not be received or considered by the Engineer; the bidder shall show such evidence by clearly displaying his or her current license number on the outside of the sealed envelope in which the proposal is delivered. A cashier's check or bid bond payable to Alabama State Parks in an amount not less than five (5) percent of the amount of the bid, but in no event more than $10,000, must accompany the bidder's proposal. Bids submitted prior to the bid opening may be mailed or delivered in person to the office of State Parks at the address stated below. The Owner reserves the right to reject any or all proposals and to waive technical errors if, in the Owner's judgement, the best interests of the Owner will thereby be promoted. The Owner reserves the right to waive any informality or to reject any or all bids, and to award the contract to the lowest and most responsible bidder. All bidders must comply with the requirements of the Contractor's Licensing Law of the State of Alabama and be certified for the type of work on which the proposal is submitted. Each bidder must deposit with his bid, security in the amount, form, and subject to the conditions provided in the Information for Bidders. All Contractors preparing Bids for the referenced project shall submit a list of similar projects (successfully completed) in the last two years, having the same scope of work with construction cost similar to or greater than this project. All nonresident contractors preparing bids shall submit with the bid documents evidence of a current Alabama General Contractor's License, evidence (with original seal of the State of Alabama) of proper registration with the Alabama Secretary of State as a foreign corporation, and a Certificate of Good Standing as a Foreign Corporation from the State of Alabama Department of Revenue. Bids submitted by a non-resident contractor without these documents included will be rejected. No bidder may withdraw his bid within sixty (60) days after the opening thereof. Bids may be held by the Owner for a period not to exceed sixty (60) days from the date of opening of bids for the purpose of reviewing the bids and investigating the qualifications of the bidders prior to awarding the contract. This project is being funded by local funds. The Owner reserves the right to accept or reject any or all Bids.

Post-Bid

Water / Sewer

$4,404,000.00

Public - State/Provincial

Site Work

51

14

6

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Tiling
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Shoring and Underpinning, Shoring, Sheet Piling
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
30
Bidding Soon
350
All Active Projects
197
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Sanitary Sewer Rehabilitation at Lakepoint State Park - Phase 1 and Phase 2

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.