BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, outdoor lighting and renovation of a mixed-use development in Sterling, Virginia. Completed plans call for the renovation of a transportation facility; for site work for a transportation facility; and for outdoor lighting for a transportation facility.

The Contractor shall convert airfield lighting to LED for Runway 1C-1C and associated Taxiways as well as replace the Airfield Lighting Control and Monitoring System (ALCMS) at Washington Dulles International Airport (IAD). Work includes conversion of existing quartz and incandescent of runway and taxiway lighting and signage to LED, modify the existing electrical power in the electrical vault and upgrading equipment including constant current regulators, etc., and pavement marking/removal throughout the multi-phased project. Question Deadline 11/25/2024 at 12:00 PM ET Any prospective offeror desiring an explanation or interpretation of the Solicitation must submit its questions via electronically. Point of Contact Darren Durbin, 703-417-8663, darren.durbin@mwaa.com Project Duration: 607 DAYS The estimated cost of this project is between $8,000,000 and $9,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Sub-Bidding

Transportation Terminals

$9,000,000.00

Public - State/Provincial

Outdoor Lighting, Renovation, Site Work

81

15

2

5

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
167
Active Projects
79
Bidding Soon
1,930
All Active Projects
758
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 20, 2024

February 20, 2025

img_map_placeholder

1 Saarinen Cir, Sterling, VA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.