BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 23, 2025 at 7:00 PM

Updated January 24, 2025

Site work for a water / sewer project in Carmel, Indiana. Completed plans call for site work for a water / sewer project.

Bid Bond in the amount of ten percent (10%) of the total Bid amount, including alternates with a satisfactory corporate surety or by a certified check on a solvent bank in the amount of ten percent (10%) of the amount of the Bid. The Bid Bond or certified check shall be evidence of good faith that the successful Bidder will execute within fifteen (15) calendar days from the acceptance of the Bid, the Agreement as included in the Bidding Documents. The Bid Bond or certified check shall be made payable to the Owner. Any questions prior to the bid should be directed to the Engineer: Philip Teague, PE pteague@jheng.com (preferred) 419-277-6039 Any Bid may be withdrawn prior to the scheduled deadline for receipt of Bids, but no bidder shall withdraw his Bid within sixty (60) days after the actual opening of the Bids. All Bid Bonds and certified checks of unsuccessful bidders will be returned by the Owner upon selection of the successful Bidder and execution of the Agreement, and provision of the required Performance Bond and Payment Bond. The Contractor must conform to the antidiscrimination provisions of Ind. Code 5-16-6 et seq. A Performance Bond with good and sufficient surety, acceptable to the Owner and Engineer, shall be required of the successful Bidder in an amount equal to at least one hundred percent (100%) of the Contract Price, conditioned upon the faithful performance of the Agreement. The Contractor shall execute a Payment Bond to the Owner, approved by Owner and Engineer and for the benefit of the Owner, in an amount equal to one hundred percent (100%) of the Contract Price. The Payment Bond is binding on the Contractor, their subcontractor, and their successors and assigns for the payment of all indebtedness to a person for labor and services performed, material furnished, or services rendered. The Payment Bond must state that it is for the benefit of the subcontractors, laborers, material suppliers, and those performing services. The surety of the Payment Bond may not be released until one (1) year after the Owner's final settlement with the Contractor. All out-of-state corporations must have a certificate of authority to do business in the State. Application forms may be obtained by contacting the Secretary of State, State of Indiana, Statehouse, Indianapolis, Indiana 46204. Question Deadline 11/20/2024 Questions received less than ten (10) days prior to the date for opening of Bids may not be answered.

Award

Water / Sewer

$848,848.00

Public - City

Site Work

16

16

6

6

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
137
Active Projects
60
Bidding Soon
1,192
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 4, 2024

January 3, 2025

Project location map

To Be Determined, Carmel, IN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.