Renovation of an educational facility in Auburn, Michigan. Completed plans call for the renovation of a educational facility.

Sealed bid proposals will be accepted from qualified contractors by Bay City Public Schools for the 2020 Bond Series 3 Phase 4 Western HS Bathrooms Bay City Public Schools - 2020 Bond Series 3 - Phase 4 Western HS Bathrooms A. Alternate No. 1: Acoustical Lay-in Ceilings: Base Bid: Remove existing acoustical lay-in ceilings where shown and replace with new. Alternate: Salvage existing acoustical ceiling tiles for re-installation. Paint ceiling grid in place, reinstall ceiling tiles. Broken or stained tiles to be replaced from Owner's stock. B. Alternate No. 2: Toilet Compartments: Base Bid: Provide products manufactured by Scranton Products as specified. Alternate: Provide products manufactured by one of listed Substitute Manufacturers in panel color and texture to match base bid specified panel. A Bid Security by a qualified surety authorized to do business in the state where the Project is located and in the amount of five percent (5%) of the Base Bid shall accompany each proposal or proposal combination. All bidders must provide familial disclosure in compliance with MCL 380.1267 and attach this information to the bid. The bid shall be accompanied by a sworn and notarized statement disclosing any familial relationship that exists between the Owner or the employee of the bidder and any member of the board, intermediate school board, or board of directors or the superintendent of the school district, intermediate superintendent of the intermediate school district, or chief executive officer of the public-school academy. The district shall not accept a bid that does not include this sworn and notarized disclosure statement. The Owner reserves the right to reject any or all proposals, accept a bid other than the low bid, and to waive informalities, irregularities, and/or errors in the bid proposals, which they feel to be in their own best interest. Addendum #1 has been issued as of 11-21-2024. The Owner will award contracts on or about Monday, December 9, 2024. All questions regarding the bidding procedures, design, and drawing/specification intent are to be directed to the Construction Manager on a Clarification Request Form (Section 00310), attention Dale Schwerin dschwerin@wolgast.com Division Inclusions: 1. Provide, receive, store, protect, inventory, and install all described bid items. 2. Provide proper legal off-site disposal off all construction debris generated by the described work. 3. Remove items indicated: clean, service and otherwise prepare them for reuse; store and protect against damage. Reinstall items in the same locations or in locations indicated. 4. Cover all countertops with double layered corrugated cardboard. 5. Clean and dust all casework upon completion. 6. Clean, prep and adjust all equipment immediately prior to Owner occupancy. 7. Patch all demolished areas and items affected by demolition to a condition ready to receive finishes and finish materials. 8. Furnish and install all joint sealants and fire stopping as indicated in specifications and drawings including but not limited to perimeter joints of doors and louvers at interior and exterior, perimeter joints between interior wall surfaces and frames of interior doors and all other joints indicated. 9. Provide all temporary enclosures as required, review demo drawings throughout the duration of construction. 10. Contractor shall furnish and install temporary insulated weather-tight closures of openings created as a result of the work in this scope in exterior surfaces to provide acceptable working conditions and protection for materials, to allow for temporary heating, and for building security. Provide doors with self-closing hardware and locks. 11. Provide all wood framing, plywood and nailers as shown and specified. Project Inclusions: 1. Price all alternates 2. For Alternate 1 this Contractor is to remove and reinstall ceiling tiles and replace damaged ones with Owner stock. 3. Include an allowance of $5,000 in your bid to be used at the direction of the Construction Manager. 4. Include all removals called out on the drawings with the exception of mechanical, electrical, and plumbing. 5. Remove existing access panels as noted. 6. Salvage all items noted on the drawings and turn them over to the owner. 7. Include floor tile power washing as noted in the drawings. 8. Patch exposed anchor holes in walls with epoxy at glazed CMU and grout at painted CMU. 9. Detach and reinstall restroom accessories as noted on the drawings. 10. Provide and install noted Restroom accessories, grab bars, mirrors, etc. and required blocking. 11. Install Owner provided accessories. 12. Provide and install new stainless-steel plate covers. 13. Provide and install new toilet compartments. 14. Provide and install new ceiling grid and tile. 15. When working with ceiling grid and tile this Contractor is responsible for working with any escutcheon rings for sprinkler heads. Painting - 1. Follow room finish and door schedules. 2. Painting of all electrical and mechanical lines and equipment (as specified). 3. Paint all bulkheads. 4. All surfaces to be painted, including but not limited to drywall and masonry, are to be inspected and accepted by this contractor prior to application of paint. Surface imperfections not repaired prior to painting or submitted to the construction manager in writing as existing defects prior to painting will be repaired by the painting contractor at no additional cost. 5. The Painting Contractor is responsible for removing or protecting all cover plates, trim and other pre-finished surfaces necessary for the completion of this work scope. This Contractor is responsible for replacing anything removed upon completion of work. 6. Provide final cleaning of work prior to Owner occupancy. 7. Furnish and install all caulking required for the work of this Bid Division. 8. To repair any adjacent material damaged in the execution of the above-listed work. 9. All caulking of interior control joints 10. All caulking of interior joints between all dissimilar surfaces including door and window frames, CMU & Drywall. 11. Clean, dust and dirt off bar joist, deck and ductwork prior to painting. The Work covered by this section of Specifications includes, but is not limited to, the following: 1. Demolish and remove existing materials as shown on the plan and noted in the Description of Work. 2. Cover holes and other hazardous openings with approved materials and barriers. 3. Remove all demolition materials and debris from the construction site and dispose of in a legal manner. 4. Protect adequately the construction site, adjoining property, and utility services as work proceedsthrough all stages. PID- 2019113.3

Award

Educational

$1,000,000.00

Public - City

Renovation

29

25

3

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
114
Active Projects
69
Bidding Soon
669
All Active Projects
234
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 25, 2024

December 10, 2024

img_map_placeholder

500 W Midland Rd, Auburn, MI

Related To This Project


New Year, New Possibilities. Make the connections you need to kickstart 2025.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.