Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Remodeling of a clubhouse / community center in Beebe, Arkansas. Completed plans call for the remodel of a clubhouse / community center.
All work must be completed by April 1st, 2025 A bid guarantee in an amount equal to (5) percent of the base bid. The Bid Guarantee can be in the form of a certified check or cashiers check made payable to PHA, The successful bidder shall be required to furnish an Arkansas Performance and Payment bond or Bonds in the amount of 100percent of the Contract Bid for contracts that exceed$25,000.00. The PHA reserves the right to reject any or all bids for a waive any informalities in the bidding. No bid shall be withdrawn for a period of Sixty (60) days subsequent t the opening for bids without the consent of the PHA. Bid Guarantees will be returned upon the sixtieth day. 5 New Windows: White on interior, Dark Brown on exterior: Contractor furnish Energy Efficientvinyl windows. (1) Double hung Kitchen: 35"x 52" (2) X2 Slider windows-shop65"x 50, Community room 65" x52" (3) X2 "3 Lite": slideroffice/Community room 128" x 52Removal of old Windows,Caulking, and other applicableitems. Frame-In Stud walls approximately 2'-5 3/4 " tall at bottoms of newly installed energyefficient vinyl windows. Contractorto Furnish framing Materials. Paint Exterior Brick: One coat of Primer and 2 coats of exterior Masonry Paint. Must be powerwashed and properly preppedprior to painting. Contractor to coordinate with client on material,color and styling. Client to FurnishPaint. Remove and replace Approximately 405 Linear Feet of old Disjoined Metal Fascia with newBrown colored Fascia (match windows, gutters) Weather Light Aluminum Fascia. Contractor toFurnish Materials. Replacement of all existing Exterior Siding with Metal Sidingthat looks like wood. Install Brown Color Gutters with Leaf Guard (must match Windows Fascia) Along all Specified Areas: Contractor to Furnish Materials. Paint all Eves to match newfascia color: Contractor to Furnish Materials. Mill, Remove, or Repair FrontPorch Contrite in needed areas.Then Stain repaired concrete infront and back. Contractor to Furnish Materials. Cedar Wrap 4" x 4" steel Porch Posts and overhead Beam. Replace or Paint damaged eaves as needed. Contractor to Furnish Materials. Inside Work: Contractor mustdo their own measuring. Frame in stud two large inside windows 105 sq ft, prep for SheetRock, Texture and Paint. Contractor to Furnish Materials Frame in stud small window in office, install a standard whitevinyl window 36" x 36". Contractor to Furnish Materials Frame in stud small opening atkitchen and drywall, texture paint.Contractor to Furnish Material Sheet Rock over existing paneling, finish out, Texture and Paint est 2500 sq ft. Texture and paintexisting sheet rocked ceiling and bathrooms, est 700 sq ft. Installsheet rock under windows. Contractor to coordinate with clientcolor and styling. Est 2500 sq ft.Contractor must measure. Contractor to Furnish Materials. Client will supply Paint. Remove baseboards and replace with 4 1/4 "baseboards and shoe round. Add 4 5/8" Crown Molding and Remove and replace Door and Window trim 2 1/4 ". Paint white.Contractor to Furnish Materials Remove and install wood flooring est 1200 sq ft.: Client will supply the flooring, contractor supply material to install.
Bid Results
Clubhouse / Community Centers
$400,000.00
Public - City
Remodeling
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 4, 2024
January 3, 2025
To Be Determined, Beebe, AR
Related To This Project
Beebe, AR
Bid Date: Nov 26 2024
Beebe, AR
Bid Date: Nov 19 2024
Beebe, AR
Bid Date: Jul 23 2024
Beebe, AR
Bid Date: Jun 25 2024
Beebe, AR
Bid Date: May 02 2024
Beebe, AR
Bid Date: May 21 2024
Beebe, AR
Bid Date: Apr 24 2024
Beebe, AR
Bid Date: Feb 29 2024
Beebe, AR
Bid Date: Feb 28 2024
Beebe, AR
Bid Date: Apr 04 2024
Beebe, AR
Bid Date: Dec 12 2023
Beebe, AR
Bid Date: Nov 01 2023
Beebe, AR
Bid Date: Apr 20 2021
Beebe, AR
Bid Date: May 14 2020
Beebe, AR
Bid Date: Oct 29 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.