Site work and paving for a road / highway in Fort Mitchell, Alabama. Completed plans call for site work for a road / highway; and for paving for a road / highway.

County: Russell County Contract Time: 45 Working Days For constructing the Micro-Milling, Resurfacing (Micro-Surfacing Seal Coat, Type II), and Traffic Stripe on SR-165 from a point 0.250 mile south of the junction of SR-208 to a point 0.360 mile south of the junction of New Hope Church Road. Length 5.110 mi. The Bracket Estimate on this project is from $1,253,588 to $1,532,163 If further clarification is needed, please contact the Plans and Proposals Section of the Bureau of Office Engineer with any questions you may have. We strongly encourage you to e-mail us at offengr@dot.state.al.us. We will work with you to resolve any issues. The total amount of uncompleted work under contract to a contractor must not exceed the amount of his or her qualification certificate. Minimum Wage Rates have been pre-determined by the Secretary of Labor and are set forth in the advertised specifications. Federal Aid Projects are also subject to the contract work hours and Safety Standards Act and its implementing regulations. Cashier's check or bid bond for 5% of bid (maximum - $50,000.00) made payable to the Alabama Department of Transportation must accompany each bid as evidence of good faith. The Alabama Department of Transportation, proposals will be issued only to prequalified contractors or their authorized representatives, upon requests that are received before 10 AM., on the day previous to the day of opening of bids. The bidder's proposal must be submitted on the complete original proposal furnished him or her by the Alabama Department of Transportation. The right to reject any or all bids is reserved. ALDOT - Call Order 047 - Micro-Milling, Resurfacing (Micro-Surfacing Seal Coat, Type II), and Traffic Stripe on SR-165 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The following table shows the amount of bituminous material and the size and amount of cover aggregate required for the various types of bituminous treatments. The types are designated in the table by letters of the alphabet such as A, B, C, D, etc. The proposal will designate in the pay item description which of the various types are to be used. The kind of bitumen may also be specified or, if none is specified, the Contractor may select one of the kinds, if not in conflict with other provisions of these Specifications, permitted by the table. All other requirements of the tabular line opposite the type designation shall apply. (Example: A bituminous treatment Type AKG, specifies a prime coat with the quantities specified on line "A", covered by a single surface treatment with the quantities specified on line "K", covered in turn by a seal treatment with the quantities shown on line "G".) Bituminous materials shall be placed within the tolerance specified by the table for the type treatment involved, unless otherwise ordered by the Engineer in writing. Any variation outside of the designated limits shall be cause for ordering the treatment to be removed and replaced or corrected as directed by the Engineer, all without additional cost to the Department. The rate of aggregate coverage shown by the table is the approximate rate found to produce an acceptable coverage when properly applied. Regardless of the rate shown, the Contractor shall provide aggregate in sufficient quantities and so spread the aggregate that the bitumen is uniformly and evenly covered. The Engineer will notify the Contractor in writing should it become advisable to change the amounts of any material from the limits specified in the table. In such event an adjustment in the contract unit price will be made as specified in Subarticle 401.06(a). The work under this Section covers the general requirements that are applicable to all types of hot and warm mix asphalt pavements of the plant mix type. Deviations from these general requirements will be indicated in the specific requirements for various types of mixes noted in the following sections of these Specifications. This work shall consist of one or more courses of hot and warm mix asphalt plant mix constructed in accordance with these specifications and the specific requirements of the type of mixture required and in reasonably close conformity with the lines, grades, thicknesses, and typical cross sections shown on the plans or established by the Engineer. The Contractor may use either hot mix or warm mix for all Superpave ESAL Range mixes in Sections 420, 423, and 424. Warm mix asphalt shall be defined as the use of an approved warm mix technology in the plant mix at the time of production. This work shall also include the preparation of the underlying surface on which the plant mix is to be placed, including patching and/or leveling as shown on the plans or directed by the Engineer. In addition, this work shall also include the placing of widening at locations shown on the plans and/or directed by the Engineer. In general, widening shall consist of (1) narrow width build-ups, three feet or less {one meter or less}, required for widening existing pavement, (2) paving for turn-outs beyond three feet {one meter} from the edge of pavement, (3) pavement crossovers, and (4) turning lanes of less than 200 feet {60 m} for crossovers. Paving used on turn-outs for intersecting paved roads and shoulder paving will not be considered as widening unless shown on the plans. Surface layers and wearing layers are defined as those layers where the pay item contains the wording "Wearing Surface". All ALDOT procedures referenced are applicable to both hot and warm mix asphalt. This Section shall cover the preparatory work and operations including, but not limited to, those necessary for the movement of personnel, equipment, supplies, and incidentals to the project site; for the establishment of all offices, buildings, and other facilities necessary for work on the project; and for all other work and operations which must be performed or costs incurred prior to beginning work on the various items on the project site. The lump sum bid for mobilization shall be so distributed among the various pay items of the contract that an overrun of a particular pay item will not adversely affect the unit price of that item. When this item is included in the proposal, it shall consist of the Contractor furnishing, placing, and maintaining construction stakes, lines, and grades necessary for establishing the accurate location of all features of construction. This Section shall cover the cost of construction fuel for the equipment necessary for the performance of the required work except for the production of Hot Mix Asphalt (HMA).

GC Bidding

Roads / Highways

$1,532,163.00

Public - State/Provincial

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
36
Active Projects
16
Bidding Soon
367
All Active Projects
167
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 6, 2024

February 4, 2025

img_map_placeholder

AL-165, Fort Mitchell, AL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.