Site work for a road / highway in Marshall, Michigan. Completed plans call for site work for a road / highway.

Construction began January 13, 2025 and is expected to be complete by September 17, 2027. 11.64 mi of clearing of both the median and outside clear zones based on the slope conditions to remove fixed objects on I-69 from south of M-60 to south of M-96, Calhoun County. Question Deadline 11/29/2024 All inquiries concerning the plans and proposal for this project are to be directed to: David Neubauer Projects & Contracts Admin Engineer MDOT-eProposal@Michigan.gov To be able to process and distribute an addendum, if required, all inquiries shall be made at least seven (7) calendar days before the letting. Net classification required for this project is 1113 N2 In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of I. If the prime contractor is not prequalified in this subclassification it must use a prequalified subcontractor. This subcontractor must be designated prior to award of the contract to the confirmed low bidder. Control Sec Job No Federal No HSIP 13073 209387A 25A0108 MIDOT - 2412 048 - Clearing of Both the Median and Outside Clear Zones Based on the Slope Conditions to Remove Fixed Objects on I-69

Under Construction

Roads / Highways

$774,690.00

Public - State/Provincial

Site Work

81

9

3

7

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Excavation and Fill, Excavation, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings, Planting, Turf and Grasses, Seeding, Plants, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
113
Active Projects
57
Bidding Soon
1,254
All Active Projects
545
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 6, 2024

January 13, 2025

img_map_placeholder

I-69, Marshall, MI


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Clearing of Both the Median and Outside Clear Zones Based on the Slope Conditions to Remove Fixed Objects on I-69

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.