BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Coupeville, Washington. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Consultants will be considered for the following project: RHODODENDRON PARK ROAD TO PATMORE ROAD TRAIL PROJECT DESCRIPTION The work to be performed by the CONSULTANT consists of preparing preliminary engineering, PS&E for the design and construction of a 10-ft wide asphalt non-motorized multi-use trail in WSDOT right-of-way adjacent to SR-20 between Rhododendron Park Road and Patmore Road in the vicinity of the Town of Coupeville and Island County, WA. The general scope of work for the project includes 100 percent design and PS&E for a cost opinion to construct the trail and addressing the following major features/challenges: Design and engineering of a paved 10-foot-wide multi-use pedestrian, bicycle, and equestrian surface trail in a rural and urban setting Design drainage features Geotechnical and Storm-water analysis Coordination with property owners Determination of right of way needs, right of way plan preparation Environmental planning, preparation and securing all environmental and regulatory permit applications and completion of required environmental documentation Performance of tree survey following Chapter 2 of the WSDOT Roadside Policy Manual requirements Development of environmental mitigation strategies as necessary Performance of soils exploration and analysis Design retaining walls if any Traffic Control Plans for work in SR 20 Right-of-Way Familiarity with WSDOT Design Manual, Shared Use Paths, Chapters 1510 and 1515 Familiarity with Federal Highway Administration policies and standards for shared use trails Coordination with Utility purveyors regarding all utility related issues Public outreach and coordination working with WSDOT, local governments, property owners, and other stakeholders Estimate project cost and construction schedule All design work to meet/follow AGENCY standards, the WSDOT LAG Manual, the WSDOT Design Manual, WSDOT Construction Manual, WSDOT Environmental Manual, WSDOT Roadside Policy Manual, WSDOT Highway Runoff Manual, WSDOT Hydraulics Manual, WSDOT Roadside Integrated Vegetation Management Plans (IVM), WSDOT Maintenance Manual, and applicable State and Federal regulations. The method of Contractor Selection has not been Determined at this time.

Conceptual

Roads / Highways

$490,000.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
147
Active Projects
47
Bidding Soon
2,052
All Active Projects
833
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 2, 2025

img_map_placeholder

State Rte 20, Coupeville, WA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.