BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 16, 2025 at 7:00 PM

Updated January 17, 2025

Site work for a water / sewer project in Aptos, California. Completed plans call for site work for a water / sewer project.

The project location in the County of Santa Cruz is as follows: o West Seacliff Area, Aptos CA Work includes replacement and rehabilitation of sewer mains, lining existing manholes, and replacing frames and covers. Pavement work is not part of this contract. Complete the work within 90 working days. The estimated cost of the project is $3,855,000.00. 1.2. Background This project will precede a roadway paving project, managed by County of Santa Cruz Department of Community Development and Infrastructure's (CDI) Roads Division. The paving must take place in summer 2025, so the West Seacliff Sewer Rehabilitation Project shall be complete by June 30, 2025. Question Deadline 11/26/2024 at 5:00 PM PT Any questions concerning the bid process, required submittals, evaluation criteria, bid schedule, and selection process should be sent through the online e-Procurement Portal

Award

Water / Sewer

$2,622,570.00

Public - County

Site Work

50

13

5

6

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
340
Active Projects
139
Bidding Soon
2,203
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 5, 2024

February 3, 2025

Project location map

Multiple Locations, Aptos, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.