BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 5, 2026 at 7:00 PM

Updated March 6, 2026

Site work and new construction of a mixed-use development in Buckeye, Arizona. Conceptual plans call for the construction of a fire / police facility.

Locate a singular or combination of sites to accommodate the construction of a Public Safety Training Facility. The Public Safety Training Facility will need a Driving Track, Fire Station, both Class A and Class B Burn Buildings, a simulations house, a large gym with full locker room facilities, an outdoor training space with a standard 400-meter running track, a vehicle and equipment storage and maintenance area, a K-9 training area, office buildings with space for command training, classrooms, and auditoriums. It is anticipated that a threat analysis at the beginning of the design process will stipulate the specific force protection measures required. A firing range and dispatch center are not required within the scope of this design. The Design Concept Report will include a comprehensive inventory and needs analysis of including staff, training, and assets as well as site development and a phasing strategy. A Design Concept Report will be required prior to design and any necessary construction needs not identified within the DCR will be excluded from the scope of this project. The project is included in the City's 2026-2030 Capital Improvement Program (CIP). As of March 05, 2026, further details have not yet been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Fire / Police

$10,000,000.00

Public - City

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2030

Project location map

To Be Determined, Buckeye, AZ

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.