BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Gloverville, South Carolina. Completed plans call for site work for a water / sewer project.

No Submitted Bid May Be Withdrawn After The Scheduled Closing Time For Receipt Of Bids For A Period Of Ninety (90) Days. All Bidders Must Have A State Of South Carolina Contractors Wl4 Or Higher License. The Work To Be Done Consists Of Furnishing All Materials, Equipment And Labor For The Construction Of: Contract 1: Sewer Replacement And Rehabilitation For Installation Of Approximately 9,000 Linear Feet Of 8- Inch Sewer, 2,800 Linear Feet Of 8-inch Sewer And 1,700 Linear Feet Of 10-inch Sewer Rehabilitation Using Cured In Place Pipe, And 2,545 Linear Feet Of 8-inch Sewer Rehabil- Itation Using Hdpe Pipe Via Pipe Bursting. Work Includes Manhole Replacement, Manhole Rehabilitation, Service Line Replacement For Approximately 200 Customers, Sewer Video, Street Overlay, Traffic Control, Sewer Abandonment, And Appurtenances. Contract 1a: (Sewer Rehabilitation) The Owner Will Consider Bids For Rehabilitation Of The En Tire Sewer System In Lieu Of Replacement. Bidders May Submit Proposals For One Or Both Proposals For Contract 1. Award Will Not Be Based Solely On Lowest Bid. Contract 1a Bid Is For Rehabilitating Approximately 10,969 Linear Feet Of 8-inch Sewer And 1,753 Linear Feet Of 10-inch Sewer Using Cured In Place Poise And For Rehabilitating Approximately 3,825 Linear Feet Of 8-inch Sewer Using Hdpe Via Pipe Bursting. Work Includes Manhole Re- Placement, Manhole Rehabilitation, Service Line Replace Ment For Approximately 200 Customers, Sewer Video, Street Overlay, Traffic Control, And Appurtenances. Contract 2: Waterline Replacement. For Installation Of Approximately 11,600 Linear Feet Of 6- Inch Ductile Iron Pipe, 850 Linear Feet Of 8-inch Ductile Iron Pipe, 360 Linear Feet Of Directional Drill Using 6- Inch Or 8- Inch Ductile Iron Pipe, And 1,250 Linear Feet Of 2" Polyeth- Ylene Pipe. Work Includes Fire Hydrant Replacement, Valves, Street Overlay, Traffic Control, Service Line Re Placement For Approximately 200 Customers, Waterline Abandonment, Testing, And Appurtenances. Time Allot- Ted For This Project Is 365 Consecutive Calendar Days For Final Completion Of Works Including Punchlist Items. Proposals For The Complete Work In One Or Two General Contract Shall Be Made On The Proposal Form Provided And Shall Contain Prices In Words And Figures For The Work Bid On. The Project Is Proposed To Be Funded With South Carolina Infrastructure Investment Program (Sciip), Clean Water And Drinking Water State Revolving Funds. All Applicable State And Federal Requirements Identified In The Bid Documents Including Srf, American Iron And Steel, And Davis-bacon Special Conditions Apply. All Proposals Shall Be Accompanied By A Bid Bond Drawn In Favor Of The Vpsa, In The Amount Of At Least 5% Of The Lump Sum Bid For The Complete Work; Such Bid Bond Representing That The Bidder, If Awarded The Contract, Will Promptly Enter Into A Contract And Furnish Performance Bond And Payment Bond As Provided By Law And Approved By The Attorney For The Vpsa. Each Bond Shall Be Equal To 100% Of The Contract Amount. The Bid Bond Shall Be Forfeited To The Vpsa As Liquidated Damages If The Bidder Fails To Execute The Contract And Provide Performance And Payment Bonds Within 10 Days After Being Notified That He Has Been Awarded The Contract.

GC Bidding

Water / Sewer

$400,000.00

Public - County

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
28
Bidding Soon
489
All Active Projects
239
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 12, 2024

January 13, 2025

img_map_placeholder

Multiple Locations, Gloverville, SC

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.